Highway Construction — Prentiss, Mississippi
WD MS20260112-15633-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Prentiss, Mississippi (construction type: highway) is $13.70/hr base + $0.00/hr fringe = $13.70/hr total package (WD MS20260112-15633-hwy, Rev. 1).
Scroll down for all 43 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $13.70 | $0.00 | $13.70 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, EXCLUDES FORM WORK | $13.49 | $0.00 | $13.49 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.07 | $0.00 | $13.07 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $21.80 | $7.93 | $29.73 +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER | $16.79 | $0.00 | $16.79 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - GUARDRAIL | $11.51 | $0.00 | $11.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $13.16 | $0.00 | $13.16 Bottom 10% -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $10.31 | $0.00 | $10.31 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.59 | $0.00 | $9.59 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE WORKER | $10.69 | $0.00 | $10.69 Bottom 10% -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $9.76 | $0.00 | $9.76 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $12.77 | $0.00 | $12.77 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $10.38 | $0.00 | $10.38 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $9.56 | $0.00 | $9.56 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.08 | $0.00 | $11.08 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $10.94 | $0.00 | $10.94 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT SPREADER | $16.03 | $0.00 | $16.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.25 | $0.00 | $14.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BORING MACHINE | $15.14 | $0.00 | $15.14 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $10.94 | $0.00 | $10.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $15.14 | $0.00 | $15.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SAW | $15.68 | $0.00 | $15.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $18.32 | $0.00 | $18.32 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $12.59 | $0.00 | $12.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $19.22 | $0.00 | $19.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.29 | $0.00 | $14.29 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $11.54 | $0.00 | $11.54 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $14.75 | $0.00 | $14.75 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $15.12 | $0.00 | $15.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $12.33 | $0.48 | $12.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $14.47 | $0.00 | $14.47 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PILEDRIVER | $15.13 | $0.00 | $15.13 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.54 | $0.00 | $11.54 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $13.75 | $0.00 | $13.75 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $10.60 | $0.00 | $10.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRENCHER | $15.00 | $0.00 | $15.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $10.63 | $0.00 | $10.63 Bottom 10% -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $13.79 | $0.00 | $13.79 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.81 | $0.00 | $12.81 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MECHANIC | $14.23 | $0.00 | $14.23 Above median -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $12.88 | $0.00 | $12.88 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $15.81 | $0.00 | $15.81 Above median -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $9.88 | $0.00 | $9.88 Bottom 10% -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Prentiss, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Prentiss
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Prentiss, Mississippi.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.