Highway Construction — Perry, Mississippi
WD MS20260139-15683-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Perry, Mississippi (construction type: highway) is $12.08/hr base + $0.00/hr fringe = $12.08/hr total package (WD MS20260139-15683-hwy, Rev. 1).
Scroll down for all 38 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $12.08 | $0.00 | $12.08 Bottom 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $11.54 | $1.63 | $13.17 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $26.12 | $6.79 | $32.91 +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER | $13.52 | $0.00 | $13.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER - SIGN | $12.19 | $0.00 | $12.19 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $16.44 | $0.00 | $16.44 -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $11.10 | $0.00 | $11.10 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING AND SPREADING; AND MASON TENDING CEMENT/CONCRETE | $10.88 | $0.00 | $10.88 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $11.42 | $0.00 | $11.42 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $14.82 | $0.00 | $14.82 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GUARDRAIL INSTALLATION | $12.39 | $0.00 | $12.39 Bottom 10% -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $12.08 | $0.00 | $12.08 Above median -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LUTEMAN | $12.88 | $0.00 | $12.88 Above median -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $14.50 | $0.00 | $14.50 -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT SPREADER | $14.71 | $0.00 | $14.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $12.57 | $0.00 | $12.57 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $11.86 | $0.00 | $11.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $10.73 | $0.00 | $10.73 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $13.27 | $0.00 | $13.27 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SAW | $14.73 | $0.00 | $14.73 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $14.80 | $0.00 | $14.80 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.46 | $0.00 | $11.46 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.12 | $0.00 | $15.12 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $13.99 | $0.00 | $13.99 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $13.00 | $0.00 | $13.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $15.24 | $0.00 | $15.24 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: OILER | $12.22 | $0.00 | $12.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $14.20 | $0.00 | $14.20 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $10.78 | $0.00 | $10.78 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $14.00 | $0.00 | $14.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $10.71 | $0.00 | $10.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| SURVEYOR | $11.56 | $0.00 | $11.56 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $13.35 | $0.00 | $13.35 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $14.72 | $0.00 | $14.72 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.07 | $0.00 | $14.07 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MECHANIC | $12.31 | $0.00 | $12.31 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $14.36 | $0.00 | $14.36 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $17.08 | $0.00 | $17.08 Above median -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Perry, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Perry
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Perry, Mississippi.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.