Highway Construction — Perry, Mississippi

WD MS20260139-15683-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Perry, Mississippi (construction type: highway) is $12.08/hr base + $0.00/hr fringe = $12.08/hr total package (WD MS20260139-15683-hwy, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: MS20260139-15683-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Perry
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference MS20260139View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $12.08 $0.00 $12.08 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.54 $1.63 $13.17 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.12 $6.79 $32.91 +19% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $13.52 $0.00 $13.52 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $12.19 $0.00 $12.19 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.44 $0.00 $16.44 -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $11.10 $0.00 $11.10 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING AND SPREADING; AND MASON TENDING CEMENT/CONCRETE $10.88 $0.00 $10.88 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $11.42 $0.00 $11.42 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $14.82 $0.00 $14.82 -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GUARDRAIL INSTALLATION $12.39 $0.00 $12.39 Bottom 10% -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.08 $0.00 $12.08 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.50 $0.00 $14.50 -19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.57 $0.00 $12.57 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.86 $0.00 $11.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $10.73 $0.00 $10.73 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.27 $0.00 $13.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $14.73 $0.00 $14.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $14.80 $0.00 $14.80 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.46 $0.00 $11.46 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.12 $0.00 $15.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.99 $0.00 $13.99 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $13.00 $0.00 $13.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.24 $0.00 $15.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.22 $0.00 $12.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $14.20 $0.00 $14.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.78 $0.00 $10.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.71 $0.00 $10.71 $0.00 $0.00 $0.00 $0.00
SURVEYOR $11.56 $0.00 $11.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.35 $0.00 $13.35 -45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.72 $0.00 $14.72 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $14.07 $0.00 $14.07 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $12.31 $0.00 $12.31 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $14.36 $0.00 $14.36 -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $17.08 $0.00 $17.08 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Perry, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.