Highway Construction — Madison, Mississippi

WD MS20260137-15662-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Madison, Mississippi (construction type: highway) is $12.32/hr base + $0.00/hr fringe = $12.32/hr total package (WD MS20260137-15662-hwy, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: MS20260137-15662-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Madison
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference MS20260137View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $12.32 $0.00 $12.32 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.85 $0.39 $13.24 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.04 $5.87 $29.91 +9% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $10.86 $0.00 $10.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $12.07 $0.00 $12.07 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $11.54 $0.00 $11.54 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.52 $0.00 $15.52 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING; AND GRADE CHECKING $10.38 $0.00 $10.38 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $9.91 $0.00 $9.91 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.26 $0.00 $10.26 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.27 $0.00 $11.27 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.44 $0.00 $13.44 -25% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.37 $0.00 $14.37 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.64 $0.00 $11.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $10.48 $0.00 $10.48 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.88 $0.00 $13.88 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $10.95 $0.00 $10.95 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $0.00 $14.28 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRINDING/GROOVING MACHINE $15.90 $0.00 $15.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.28 $0.00 $13.28 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $13.00 $0.00 $13.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $14.68 $0.00 $14.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: MIXER $14.25 $0.00 $14.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.35 $0.00 $12.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $11.74 $0.00 $11.74 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.85 $0.00 $10.85 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.25 $0.00 $12.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.56 $0.00 $10.56 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION $30.35 $11.39 $41.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.02 $0.00 $11.02 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.06 $0.00 $14.06 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.08 $0.00 $12.08 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $13.00 $0.00 $13.00 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $12.50 $0.00 $12.50 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $10.00 $0.00 $10.00 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Madison, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Madison

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260137-15662-hwy →