Highway Construction — Lowndes, Mississippi

WD MS20260101-15626-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Lowndes, Mississippi (construction type: highway) is $13.30/hr base + $0.87/hr fringe = $14.17/hr total package (WD MS20260101-15626-hwy, Rev. 1).

Scroll down for all 43 trade classifications covered by this determination.

WD Number: MS20260101-15626-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Lowndes
Effective: May 17, 2026
Trades covered: 43
Official source: SAM.gov reference MS20260101View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.30 $0.87 $14.17 -36% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $13.49 $0.00 $13.49 -39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.99 $0.00 $14.99 -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.80 $7.93 $29.73 +8% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $16.79 $0.00 $16.79 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $11.51 $0.00 $11.51 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.06 $0.00 $15.06 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $11.46 $0.00 $11.46 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.12 $0.00 $10.12 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $10.69 $0.00 $10.69 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $9.10 $0.00 $9.10 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $12.77 $0.00 $12.77 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.38 $0.00 $10.38 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.56 $0.00 $9.56 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.08 $0.00 $11.08 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $10.76 $0.00 $10.76 -40% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $16.03 $0.00 $16.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.66 $0.00 $14.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: BORING MACHINE $15.14 $0.00 $15.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $11.04 $0.00 $11.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $15.68 $0.00 $15.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $18.32 $0.00 $18.32 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $12.59 $0.00 $12.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $19.22 $0.00 $19.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.90 $0.00 $14.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $15.71 $0.00 $15.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.12 $0.00 $15.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.33 $0.48 $12.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.13 $0.00 $17.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $15.13 $0.00 $15.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.58 $0.00 $11.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $13.15 $0.00 $13.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $11.64 $0.00 $11.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.56 $0.00 $11.56 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $13.79 $0.00 $13.79 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $11.00 $0.00 $11.00 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $15.71 $0.00 $15.71 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $12.29 $0.00 $12.29 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $15.81 $0.00 $15.81 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $9.68 $0.00 $9.68 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lowndes, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lowndes

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260101-15626-hwy →