Highway Construction — Lee, Mississippi

WD MS20260098-15624-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Lee, Mississippi (construction type: highway) is $16.10/hr base + $0.00/hr fringe = $16.10/hr total package (WD MS20260098-15624-hwy, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: MS20260098-15624-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Lee
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference MS20260098View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $16.10 $0.00 $16.10 -27% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $13.50 $0.00 $13.50 -39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.14 $0.00 $13.14 -39% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.80 $7.93 $29.73 +8% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $11.56 $0.00 $11.56 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $11.51 $0.00 $11.51 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.40 $0.00 $16.40 -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING AND CONCRETE WORK $10.21 $0.00 $10.21 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $9.76 $0.00 $9.76 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $12.77 $0.00 $12.77 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.38 $0.00 $10.38 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.56 $0.00 $9.56 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.31 $0.00 $11.31 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $9.75 $0.00 $9.75 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $16.03 $0.00 $16.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.64 $0.00 $14.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: BORING MACHINE $15.14 $0.00 $15.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $10.94 $0.00 $10.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.24 $0.00 $15.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $15.68 $0.00 $15.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.00 $0.00 $19.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $12.59 $0.00 $12.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $19.22 $0.00 $19.22 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.50 $0.00 $14.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $11.54 $0.00 $11.54 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $14.58 $0.00 $14.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $15.12 $0.00 $15.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.33 $0.00 $12.33 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.67 $0.00 $17.67 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $15.13 $0.00 $15.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.54 $0.00 $11.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.26 $0.00 $12.26 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.80 $0.00 $12.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.00 $0.00 $12.00 -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $13.79 $0.00 $13.79 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $15.76 $0.00 $15.76 -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $14.23 $0.00 $14.23 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $12.29 $0.00 $12.29 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $15.81 $0.00 $15.81 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $10.58 $0.00 $10.58 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lee, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260098-15624-hwy →