Heavy Construction — Hancock, Mississippi

WD MS20260059-15686-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Hancock, Mississippi (construction type: heavy) is $16.57/hr base + $0.00/hr fringe = $16.57/hr total package (WD MS20260059-15686-hvy, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: MS20260059-15686-hvy
Revision: 1
Construction Type: heavy
State: Mississippi (MS)
County: Hancock
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference MS20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.57 $0.00 $16.57 -25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.75 $0.00 $17.75 -17% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $27.16 $7.45 $34.61 +26% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.63 $0.00 $20.63 +9% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $19.00 $0.00 $19.00 +0% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $12.00 $0.00 $12.00 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $14.04 $1.92 $15.96 Top 10% -11% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.89 $0.00 $17.89 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.85 $1.18 $20.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.66 $4.66 $27.32 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $16.03 $0.95 $16.98 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hancock, MS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hancock

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260059-15686-hvy →