Highway Construction — Copiah, Mississippi

WD MS20260129-15649-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Copiah, Mississippi (construction type: highway) is $13.28/hr base + $0.00/hr fringe = $13.28/hr total package (WD MS20260129-15649-hwy, Rev. 1).

Scroll down for all 40 trade classifications covered by this determination.

WD Number: MS20260129-15649-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Copiah
Effective: May 17, 2026
Trades covered: 40
Official source: SAM.gov reference MS20260129View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.28 $0.00 $13.28 -40% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.01 $0.00 $15.01 -30% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.04 $5.87 $29.91 +9% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $12.05 $0.00 $12.05 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $12.07 $0.00 $12.07 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $12.38 $0.00 $12.38 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.47 $0.00 $15.47 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING $10.06 $0.00 $10.06 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $10.40 $0.00 $10.40 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $9.94 $0.00 $9.94 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $8.25 $0.00 $8.25 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.27 $0.00 $11.27 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.44 $0.00 $13.44 -25% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.69 $0.00 $14.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.64 $0.00 $11.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $10.14 $0.00 $10.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.25 $0.00 $15.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $16.50 $0.00 $16.50 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.22 $0.00 $19.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.17 $0.00 $11.17 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $11.67 $0.00 $11.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRINDING/GROOVING MACHINE $16.86 $0.00 $16.86 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.75 $0.00 $16.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.16 $0.00 $19.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $14.68 $0.00 $14.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: MIXER $14.25 $0.00 $14.25 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $12.35 $0.00 $12.35 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $11.40 $0.00 $11.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.29 $0.00 $11.29 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.25 $0.00 $12.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $11.22 $0.00 $11.22 $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION $30.35 $11.39 $41.74 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.66 $0.00 $12.66 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.06 $0.00 $14.06 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $11.96 $0.00 $11.96 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $13.00 $0.00 $13.00 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $14.60 $0.00 $14.60 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $19.00 $0.00 $19.00 Above median -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Copiah, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Copiah

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260129-15649-hwy →