Davis-Bacon Wage Determinations — Coahoma, Mississippi

Coahoma has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Coahoma, Mississippi cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MS20260046-15620-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MS20260073-15620-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MS20260089-15620-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MS20260008-15620-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Coahoma

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 IRONWORKER, STRUCTURAL building $30.00 $19.58 $49.58 WD →
2 PLUMBER building $30.41 $11.47 $41.88 WD →
3 SELF-PROPELLED HOPPER DREDGE, DRAG TENDER heavy $25.20 $8.96 $34.16 WD →
4 SHEET METAL WORKER, Includes HVAC Duct Installation building $21.86 $11.18 $33.04 WD →
5 IRONWORKER: STRUCTURAL heavy $21.00 $8.81 $29.81 WD →
6 IRONWORKER heavy $21.00 $8.81 $29.81 WD →
7 PIPEFITTER building $22.77 $6.96 $29.73 WD →
8 ELECTRICIAN highway $21.80 $7.93 $29.73 WD →
9 SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 21.86 11.18 PIPEFITTER building $22.77 $6.96 $29.73 WD →
10 OPERATOR: Crane highway $21.25 $0.00 $21.25 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →