Building Construction — Clay, Mississippi

WD MS20260045-15619-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Clay, Mississippi (construction type: building) is $16.13/hr base + $0.00/hr fringe = $16.13/hr total package (WD MS20260045-15619-bld, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: MS20260045-15619-bld
Revision: 1
Construction Type: building
State: Mississippi (MS)
County: Clay
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference MS20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $16.13 $0.00 $16.13 -27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.00 $0.00 $20.00 -6% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $36.28 $29.69 $65.97 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $30.00 $19.58 $49.58 Above median +162% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.36 $0.00 $11.36 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.98 $0.00 $12.98 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.52 $0.75 $13.27 -26% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.00 $0.00 $18.00 $0.00 $0.00 $0.00 $0.00
PAINTER $15.17 $0.00 $15.17 -23% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.41 $11.47 $41.88 +50% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 21.86 11.18 PIPEFITTER $22.77 $6.96 $29.73 Top 10% +26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.92 $1.91 $15.83 -35% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Clay, MS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Clay

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260045-15619-bld →