Highway Construction — Benton, Mississippi

WD MS20260128-14712-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Benton, Mississippi (construction type: highway) is $13.75/hr base + $0.39/hr fringe = $14.14/hr total package (WD MS20260128-14712-hwy, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: MS20260128-14712-hwy
Revision: 1
Construction Type: highway
State: Mississippi (MS)
County: Benton
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference MS20260128View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $13.75 $0.39 $14.14 -36% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.85 $0.39 $13.24 -38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.78 $7.38 $31.16 +13% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $9.04 $0.90 $9.94 Bottom 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $18.39 $0.00 $18.39 Top 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.57 $0.00 $15.57 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING; CONCRETE WORK; GRADE CHECKING; AND MASON TENDING - CEMENT/CONCRETE $11.26 $0.00 $11.26 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $9.59 $0.00 $9.59 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.25 $0.00 $10.25 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.28 $0.90 $10.18 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LUTEMAN $12.88 $0.00 $12.88 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.93 $0.00 $12.93 -28% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $14.71 $0.00 $14.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $14.76 $0.00 $14.76 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $11.64 $0.00 $11.64 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $12.82 $0.00 $12.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.21 $0.00 $14.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.97 $0.00 $19.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.54 $0.00 $13.54 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $20.92 $0.00 $20.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $16.20 $0.00 $16.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $9.50 $0.00 $9.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $11.78 $0.00 $11.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.07 $0.00 $13.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $12.25 $0.00 $12.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.78 $0.00 $10.78 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $12.50 $1.23 $13.73 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.66 $0.00 $12.66 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $13.00 $0.00 $13.00 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.43 $0.00 $12.43 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $13.00 $0.00 $13.00 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $15.22 $0.00 $15.22 -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $14.49 $0.00 $14.49 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Benton, MS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Benton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260128-14712-hwy →