Heavy Construction — Alcorn, Mississippi

WD MS20260072-15613-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Alcorn, Mississippi (construction type: heavy) is $16.89/hr base + $0.00/hr fringe = $16.89/hr total package (WD MS20260072-15613-hvy, Rev. 1).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: MS20260072-15613-hvy
Revision: 1
Construction Type: heavy
State: Mississippi (MS)
County: Alcorn
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference MS20260072View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.89 $0.00 $16.89 -24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES $16.24 $0.00 $16.24 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.36 $7.70 $27.06 -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $18.50 $0.00 $18.50 -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $21.00 $8.81 $29.81 Bottom 10% +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES $12.24 $0.00 $12.24 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES $13.19 $0.00 $13.19 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES $17.01 $0.00 $17.01 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER, INCLUDES WATER SEWER LINES $17.60 $0.00 $17.60 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES $12.00 $0.00 $12.00 -51% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Alcorn, MS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Alcorn

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MS20260072-15613-hvy →