Highway Construction — Todd, Minnesota

WD MN20260233-15607-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Todd, Minnesota (construction type: highway) is $41.81/hr base + $26.87/hr fringe = $68.68/hr total package (WD MN20260233-15607-hwy, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: MN20260233-15607-hwy
Revision: 1
Construction Type: highway
State: Minnesota (MN)
County: Todd
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference MN20260233View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $41.81 $26.87 $68.68 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $30.08 $16.46 $46.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
BLASTER $15.50 $5.40 $20.90 Bottom 10% $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $42.12 $25.00 $67.12 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $36.05 $19.68 $55.73 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $47.45 $31.75 $79.20 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $14.50 $2.00 $16.50 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $51.23 $26.22 $77.45 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $42.64 $26.87 $69.51 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.01 $32.79 $80.80 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $34.50 $24.26 $58.76 Above median $0.00 $0.00 $0.00 $0.00
GROUND PERSON $33.77 $20.38 $54.15 Top 10% $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $12.00 $0.00 $12.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.19 $35.68 $76.87 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.50 $24.26 $58.76 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $34.50 $24.26 $58.76 +108% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $27.74 $19.70 $47.44 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.08 $21.03 $58.11 +74% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $37.43 $22.55 $59.98 $0.00 $0.00 $0.00 $0.00
PAINTER $29.16 $19.08 $48.24 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $27.50 $20.74 $48.24 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $24.18 $7.33 $31.51 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $38.00 $24.26 $62.26 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $43.63 $22.04 $65.67 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $42.14 $26.87 $69.01 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $41.81 $26.87 $68.68 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $38.99 $26.87 $65.86 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $57.96 $34.57 $92.53 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $35.62 $25.68 $61.30 Above median $0.00 $0.00 $0.00 $0.00
TILE SETTER $30.66 $10.53 $41.19 +39% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $39.01 $26.01 $65.02 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $33.55 $24.70 $58.25 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $25.89 $13.71 $39.60 +35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $32.79 $24.70 $57.49 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $32.79 $24.70 $57.49 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $14.20 $5.40 $19.60 Bottom 10% $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $36.00 $24.26 $60.26 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $40.00 $4.48 $44.48 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $16.34 $47.59 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Todd, MN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Todd

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260233-15607-hwy →