Davis-Bacon Wage Determinations — Swift, Minnesota

Swift has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Swift, Minnesota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MN20260102-15606-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MN20260234-15606-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MN20260234-15606-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MN20260018-15606-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Swift

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELEVATOR CONSTRUCTORS building $62.52 $45.36 $107.88 WD →
2 HEATING AND FROST INSULATORS building $57.24 $31.95 $89.19 WD →
3 PIPEFITTER/STEAMFITTER building $48.24 $34.70 $82.94 WD →
4 IRONWORKER building $44.85 $35.72 $80.57 WD →
5 BOILERMAKER highway $48.35 $31.93 $80.28 WD →
6 PILEDRIVER highway $49.46 $30.23 $79.69 WD →
7 Piledriver highway $49.46 $30.23 $79.69 WD →
8 MILLWRIGHT highway $48.13 $29.41 $77.54 WD →
9 ELECTRICIAN highway $46.00 $30.00 $76.00 WD →
10 GLAZIER building $48.98 $26.75 $75.73 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →