Residential Construction — Sibley, Minnesota
WD MN20260008-15602-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for & STIFFLEG); TOWER CRANE UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT in Sibley, Minnesota (construction type: residential) is $33.44/hr base + $15.95/hr fringe = $49.39/hr total package (WD MN20260008-15602-res, Rev. 1).
Scroll down for all 65 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| & STIFFLEG); TOWER CRANE UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $33.44 | $15.95 | $49.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR | $55.34 | $34.03 | $89.37 Above median +232% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $48.00 | $31.14 | $79.14 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON | $45.11 | $25.61 | $70.72 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON | $45.11 | $25.61 | $70.72 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $36.71 | $20.17 | $56.88 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY) | $36.71 | $20.17 | $56.88 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: WOOD FRAME CONSTRUCTION | $36.71 | $20.17 | $56.88 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.46 | $23.47 | $69.93 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTY) | $21.97 | $15.79 | $37.76 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTY) | $23.64 | $16.57 | $40.21 | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTY) | $20.84 | $14.70 | $35.54 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL TAPER/FINISHER | $19.00 | $25.79 | $44.79 +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL: FINISHER | $30.17 | $18.67 | $48.84 +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL: SANDER | $22.63 | $18.67 | $41.30 +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $40.25 | $23.32 | $63.57 Above median +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $44.12 | $22.57 | $66.69 +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $43.67 | $22.35 | $66.02 +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $50.98 | $27.35 | $78.33 Above median +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $43.00 | $34.11 | $77.11 Above median +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $30.83 | $17.61 | $48.44 Above median +72% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, C | $22.84 | $16.57 | $39.41 +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, C | $20.04 | $14.70 | $34.74 +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTA | $23.54 | $16.57 | $40.11 +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTA | $20.74 | $14.70 | $35.44 +26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON | $20.84 | $16.57 | $37.41 +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON | $18.04 | $14.70 | $32.74 +16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CE | $21.17 | $15.79 | $36.96 +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CE | $18.35 | $13.94 | $32.29 +14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR | $21.88 | $15.79 | $37.67 +33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR | $19.06 | $13.94 | $33.00 +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON | $19.17 | $15.79 | $34.96 +24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON | $16.35 | $13.94 | $30.29 +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS | $16.26 | $9.68 | $25.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS | $28.25 | $16.20 | $44.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| LATHER | $39.55 | $28.63 | $68.18 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE SETTER | $45.47 | $26.33 | $71.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $42.95 | $36.81 | $79.76 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: 1 TO 3 STORIES: BRUSH & ROLLER PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OT | $19.00 | $3.00 | $22.00 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: 4 STORIES: BRUSH & ROLLER PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER T | $35.28 | $25.49 | $60.77 +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER | $31.45 | $17.85 | $49.30 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY | $31.45 | $17.85 | $49.30 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, I | $62.52 | $38.44 | $100.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $37.05 | $30.27 | $67.32 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $48.33 | $40.46 | $88.79 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTER TENDER | $21.97 | $15.79 | $37.76 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $42.52 | $30.37 | $72.89 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER FOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: INCLUDES GAS FITTERS FOOTNOTE: PAID HOLIDAY: LABOR DAY | $36.78 | $34.51 | $71.29 +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 HELICOPTER; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB; & TOWER CRANE 250' & OVER | $35.19 | $15.95 | $51.14 +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OV | $34.85 | $15.95 | $50.80 +34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER; LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR; & TRACTOR OPERATOR WITH BOOM | $33.10 | $15.95 | $49.05 +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD | $31.42 | $15.95 | $47.37 +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER; TRUCK CRANE OILER; & WELDING MACHINE | $30.30 | $15.95 | $46.25 +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER; OILER OR GREASER; & ELEVATOR | $28.29 | $15.95 | $44.24 +17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $48.32 | $25.54 | $73.86 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER; HOIST ENGINEER; STRADDLE CARRIER; POW | $32.93 | $15.95 | $48.88 | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $45.01 | $26.53 | $71.54 +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $42.94 | $27.26 | $70.20 +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $44.36 | $22.35 | $66.71 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $42.67 | $22.04 | $64.71 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $40.60 | $21.94 | $62.54 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $28.50 | $8.20 | $36.70 +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $34.92 | $21.81 | $56.73 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $39.17 | $10.16 | $49.33 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sibley, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Sibley, Minnesota.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.