Residential Construction — Scott, Minnesota
WD MN20260020-15559-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE, WASHINGTON) in Scott, Minnesota (construction type: residential) is $40.63/hr base + $28.42/hr fringe = $69.05/hr total package (WD MN20260020-15559-res, Rev. 1).
Scroll down for all 33 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER (ANOKA, CARVER, DAKOTA, RAMSEY, SCOTT, SHERBURNE, WASHINGTON) | $40.63 | $28.42 | $69.05 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (SHERBURNE) | $40.63 | $28.42 | $69.05 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER (SHERBURNE) | $36.71 | $20.17 | $56.88 Bottom 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ANOKA, DAKOTA, RAMSEY, SHERBURNE, AND WASHINGTON COUNTIES) | $53.91 | $36.48 | $90.39 +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL CONTRACTS $5 MILLION AND OVER: (SHERBURNE) | $44.12 | $22.57 | $66.69 +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $5 MILLION: (SHERBURNE) | $43.67 | $22.35 | $66.02 +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $46.35 | $36.86 | $83.21 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER, PLASTER TENDER, TOP PERSON | $32.41 | $17.44 | $49.85 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1 COMMON OR GENERAL LABORER, ASPHALT RAKER, MASON TENDER, PLASTER TENDER, TOP PERSON | $28.46 | $15.82 | $44.28 Above median +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 BOTTOM PERSON, MASON TENDER, PIPELAYER | $32.91 | $17.44 | $50.35 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 2 BOTTOM PERSON, MASON TENDER, PIPELAYER | $28.96 | $15.82 | $44.78 Above median +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $11.50 | $0.00 | $11.50 -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MISSISSIPPI RIVER)) | $59.00 | $35.79 | $94.79 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE | $34.85 | $15.95 | $50.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 3 DRAGLINE | $33.44 | $15.95 | $49.39 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE | $33.10 | $15.95 | $49.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 | $32.93 | $15.95 | $48.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE | $31.42 | $15.95 | $47.37 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 7 SELF PROPELLED VIBRATING PACKER | $30.30 | $15.95 | $46.25 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT GROUP 8 OILER | $28.29 | $15.95 | $44.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $31.89 | $17.41 | $49.30 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $31.45 | $17.85 | $49.30 Above median +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY (SHERBURNE) | $31.45 | $17.85 | $49.30 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY. PROJECTS UNDER $8,000: RECEIVE 80% OF BASIC HOURLY RATE | $24.91 | $13.31 | $38.22 +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $51.70 | $42.45 | $94.15 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (ANOKA, CARVER, SCOTT, SHERBURNE) | $48.33 | $40.46 | $88.79 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER (SHERBURNE COUNTY) | $48.33 | $40.46 | $88.79 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (ANOKA, CARVER, SCOTT & SHERBURNE) FOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER (SHERBURNE) FOOTNOTE: PAID HOLIDAY: LABOR DAY | $53.16 | $32.21 | $85.37 +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER. FOOTNOTE: PAID HOLIDAY: LABOR DAY | $50.23 | $37.52 | $87.75 +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $39.01 | $21.99 | $61.00 Above median +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.60 | $25.14 | $60.74 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY: LABOR DAY | $45.01 | $26.53 | $71.54 +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Scott, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Scott, Minnesota.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.