Building Construction — Roseau, Minnesota

WD MN20260094-15538-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Roseau, Minnesota (construction type: building) is $17.00/hr base + $0.00/hr fringe = $17.00/hr total package (WD MN20260094-15538-bld, Rev. 1).

Scroll down for all 55 trade classifications covered by this determination.

WD Number: MN20260094-15538-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Roseau
Effective: May 17, 2026
Trades covered: 55
Official source: SAM.gov reference MN20260094View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $17.00 $0.00 $17.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $32.58 $20.15 $52.73 Bottom 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.00 $31.93 $77.93 +58% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $20.00 $0.91 $20.91 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.73 $29.01 $70.74 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $24.00 $25.01 $49.01 +58% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $32.00 $24.95 $56.95 Above median +44% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $40.32 $20.69 $61.01 Above median +100% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $44.54 $26.88 $71.42 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $33.76 $23.84 $57.60 +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.50 $7.88 $39.38 +1% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $59.95 $44.53 $104.48 +85% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.19 $35.68 $76.87 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $27.28 $23.82 $51.10 +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $32.09 $23.92 $56.01 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $16.00 $0.00 $16.00 Above median -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $24.50 $7.35 $31.85 Bottom 10% +13% vs market $0.00 $0.00 $0.00 $0.00
LATHER $19.00 $0.00 $19.00 $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $44.10 $21.70 $65.80 Bottom 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $39.18 $25.33 $64.51 +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $34.23 $25.28 $59.51 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $26.54 $17.03 $43.57 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $43.54 $20.89 $64.43 +61% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $26.54 $18.05 $44.59 $0.00 $0.00 $0.00 $0.00
PLASTERER $33.22 $18.33 $51.55 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.54 $20.89 $64.43 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $42.55 $21.70 $64.25 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $47.02 $26.88 $73.90 +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $46.67 $26.88 $73.55 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $42.94 $26.88 $69.82 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $17.40 $0.52 $17.92 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $15.65 $0.46 $16.11 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $33.92 $26.40 $60.32 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $27.00 $0.00 $27.00 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $26.50 $0.50 $27.00 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $24.00 $0.00 $24.00 -36% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.88 $68.61 $0.00 $0.00 $0.00 $0.00
ROOFER $37.51 $18.19 $55.70 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.09 $20.97 $58.06 +93% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $37.19 $19.88 $57.07 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $23.50 $0.00 $23.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $40.53 $19.83 $60.36 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $14.00 $0.00 $14.00 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $37.82 $10.90 $48.72 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $21.50 $0.00 $21.50 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $21.50 $0.00 $21.50 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $15.00 $4.00 $19.00 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $13.50 $9.75 $23.25 -21% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $24.74 $18.05 $42.79 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $31.00 $7.98 $38.98 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $12.82 $44.07 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Roseau, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Roseau

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260094-15538-bld →