Davis-Bacon Wage Determinations — Rice, Minnesota

Rice has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Rice, Minnesota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MN20260092-15599-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MN20260236-15599-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MN20260236-15599-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MN20260001-15599-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Rice

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELEVATOR CONSTRUCTORS building $62.52 $45.36 $107.88 WD →
2 ELECTRICIAN building $58.31 $36.48 $94.79 WD →
3 SHEET METAL WORKER highway $57.96 $34.57 $92.53 WD →
4 PIPEFITTER/STEAMFITTER heavy $55.94 $34.50 $90.44 WD →
5 HEATING AND FROST INSULATORS building $57.24 $31.95 $89.19 WD →
6 IRONWORKER building $44.85 $35.72 $80.57 WD →
7 BOILERMAKER building $48.35 $31.93 $80.28 WD →
8 CARPENTER highway $49.82 $29.92 $79.74 WD →
9 Piledriver heavy $49.46 $30.23 $79.69 WD →
10 PILEDRIVER highway $49.46 $30.23 $79.69 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →