Building Construction — Murray, Minnesota

WD MN20260077-15591-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Murray, Minnesota (construction type: building) is $25.00/hr base + $6.00/hr fringe = $31.00/hr total package (WD MN20260077-15591-bld, Rev. 1).

Scroll down for all 53 trade classifications covered by this determination.

WD Number: MN20260077-15591-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Murray
Effective: May 17, 2026
Trades covered: 53
Official source: SAM.gov reference MN20260077View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $25.00 $6.00 $31.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $41.94 $29.99 $71.93 +46% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $35.25 $5.46 $40.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $38.05 $23.83 $61.88 Above median +44% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.14 $27.60 $60.74 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $28.55 $14.03 $42.58 +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $40.97 $8.84 $49.81 +63% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $44.54 $26.88 $71.42 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $33.66 $25.04 $58.70 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.00 $7.08 $39.08 +0% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $13.50 $3.82 $17.32 $0.00 $0.00 $0.00 $0.00
GLAZIER $37.74 $12.96 $50.70 +57% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $53.19 $31.95 $85.14 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.97 $24.46 $57.43 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.13 $0.00 $11.13 -61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $32.97 $24.46 $57.43 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICLLY SEEDING, SODDING, OR PLANT, AND TWO-FRAM $16.25 $0.00 $16.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $48.53 $26.88 $75.41 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $34.28 $24.83 $59.11 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $45.71 $29.73 $75.44 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $41.00 $14.42 $55.42 +38% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $40.14 $24.68 $64.82 Above median $0.00 $0.00 $0.00 $0.00
PLASTERER $24.00 $2.81 $26.81 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.62 $27.17 $68.79 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $48.89 $26.88 $75.77 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $47.02 $26.88 $73.90 +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $26.00 $6.00 $32.00 Bottom 10% -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $42.94 $26.40 $69.34 +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $39.74 $21.55 $61.29 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $27.50 $3.50 $31.00 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $30.00 $8.75 $38.75 +3% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $25.90 $3.21 $29.11 -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $20.00 $1.50 $21.50 -43% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.88 $68.61 $0.00 $0.00 $0.00 $0.00
ROOFER $43.30 $22.90 $66.20 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.00 $4.17 $34.17 +14% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $34.69 $19.88 $54.57 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $40.04 $22.60 $62.64 +56% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $27.00 $6.00 $33.00 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $43.73 $20.73 $64.46 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $19.69 $16.07 $35.76 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $33.00 $8.75 $41.75 +42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $33.00 $8.75 $41.75 +42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $21.00 $6.00 $27.00 -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $20.00 $1.50 $21.50 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $38.14 $24.68 $62.82 Above median $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $44.61 $20.17 $64.78 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $15.83 $47.08 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Murray, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Murray

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260077-15591-bld →