Building Construction — Mower, Minnesota

WD MN20260076-15590-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Mower, Minnesota (construction type: building) is $33.00/hr base + $7.50/hr fringe = $40.50/hr total package (WD MN20260076-15590-bld, Rev. 1).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: MN20260076-15590-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Mower
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference MN20260076View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $33.00 $7.50 $40.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.00 $31.93 $77.93 +58% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $46.51 $26.90 $73.41 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $47.31 $27.44 $74.75 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.55 $29.03 $65.58 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $39.03 $25.43 $64.46 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $47.52 $27.22 $74.74 Above median +144% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $34.05 $25.04 $59.09 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.37 $26.13 $74.50 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $27.85 $21.17 $49.02 $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $53.19 $31.95 $85.14 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.50 $24.15 $58.65 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $26.89 $19.31 $46.20 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $34.50 $24.15 $58.65 Bottom 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICLLY SEEDING, SODDING, OR PLANT, AND TWO-FRAM $26.89 $19.31 $46.20 Above median $0.00 $0.00 $0.00 $0.00
LATHER $36.55 $26.85 $63.40 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $50.64 $26.90 $77.54 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $37.83 $18.65 $56.48 $0.00 $0.00 $0.00 $0.00
PAINTER $34.28 $24.83 $59.11 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $45.71 $29.73 $75.44 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $48.06 $30.33 $78.39 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $40.14 $24.68 $64.82 Above median $0.00 $0.00 $0.00 $0.00
PLASTERER $40.50 $8.31 $48.81 +49% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $48.06 $30.33 $78.39 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $51.03 $26.90 $77.93 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $49.05 $26.90 $75.95 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $48.68 $26.90 $75.58 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $28.00 $2.62 $30.62 -19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $41.28 $26.90 $68.18 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $34.00 $7.50 $41.50 +10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $40.09 $25.00 $65.09 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $42.64 $26.87 $69.51 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $30.00 $15.16 $45.16 +20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $27.74 $19.70 $47.44 Above median +26% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $43.55 $26.90 $70.45 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $35.55 $18.77 $54.32 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $44.48 $29.77 $74.25 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $34.69 $19.88 $54.57 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $27.85 $21.17 $49.02 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $38.91 $19.40 $58.31 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $30.76 $6.02 $36.78 +24% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $37.89 $22.02 $59.91 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $53.21 $1.60 $54.81 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $42.99 $0.01 $43.00 +46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $16.85 $6.80 $23.65 Bottom 10% -19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $25.71 $8.71 $34.42 +17% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $38.14 $24.24 $62.38 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mower, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mower

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260076-15590-bld →