Building Construction — Mille Lacs, Minnesota

WD MN20260074-15588-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS ABATEMENT WORKER in Mille Lacs, Minnesota (construction type: building) is $39.58/hr base + $24.94/hr fringe = $64.52/hr total package (WD MN20260074-15588-bld, Rev. 1).

Scroll down for all 63 trade classifications covered by this determination.

WD Number: MN20260074-15588-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Mille Lacs
Effective: May 17, 2026
Trades covered: 63
Official source: SAM.gov reference MN20260074View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS ABATEMENT WORKER $39.58 $24.94 $64.52 Above median $0.00 $0.00 $0.00 $0.00
BLASTER $28.96 $15.13 $44.09 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $18.82 $4.57 $23.39 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $43.41 $28.50 $71.91 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.55 $29.03 $65.58 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $39.03 $25.43 $64.46 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $48.21 $24.97 $73.18 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $32.41 $24.43 $56.84 +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $53.91 $36.48 $90.39 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $26.16 $18.44 $44.60 $0.00 $0.00 $0.00 $0.00
FLAG PERSON $27.91 $18.44 $46.35 $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $53.19 $31.95 $85.14 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $33.84 $23.84 $57.68 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $35.59 $23.86 $59.45 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.53 $51.57 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN $33.84 $23.84 $57.68 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN $35.59 $23.86 $59.45 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $30.04 $21.53 $51.57 Top 10% $0.00 $0.00 $0.00 $0.00
LATHER $36.55 $26.85 $63.40 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $50.64 $26.40 $77.04 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $27.72 $19.55 $47.27 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $31.63 $25.28 $56.91 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $12.00 $0.00 $12.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $39.15 $19.94 $59.09 $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $53.48 $36.96 $90.44 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $40.14 $24.68 $64.82 Above median $0.00 $0.00 $0.00 $0.00
PLASTERER $47.93 $25.34 $73.27 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $56.73 $31.52 $88.25 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $45.24 $22.85 $68.09 +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $49.05 $26.90 $75.95 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $43.15 $22.85 $66.00 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $44.82 $26.40 $71.22 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $19.46 $8.34 $27.80 -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $30.00 $13.60 $43.60 +15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $42.14 $26.40 $68.54 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $29.58 $13.60 $43.18 +14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $27.57 $13.60 $41.17 +9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $24.83 $13.60 $38.43 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $43.55 $26.40 $69.95 $0.00 $0.00 $0.00 $0.00
ROOFER $41.06 $22.68 $63.74 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $48.15 $29.12 $77.27 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $34.69 $19.88 $54.57 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, +$950,000 $30.36 $21.69 $52.05 Above median $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, +$950,000 $32.11 $21.69 $53.80 Top 10% $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, -$950,000 $30.36 $21.69 $52.05 Above median $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, -$950,000 $32.11 $21.69 $53.80 Top 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $46.27 $26.64 $72.91 Top 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $26.98 $7.25 $34.23 +15% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.64 $12.47 $53.11 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $28.00 $0.84 $28.84 Bottom 10% -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $38.00 $6.91 $44.91 +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $35.60 $24.55 $60.15 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $21.41 $13.60 $35.01 +19% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $38.14 $24.68 $62.82 Above median $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mille Lacs, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.