Building Construction — Lincoln, Minnesota

WD MN20260067-15583-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS ABATEMENT WORKER in Lincoln, Minnesota (construction type: building) is $41.23/hr base + $25.99/hr fringe = $67.22/hr total package (WD MN20260067-15583-bld, Rev. 1).

Scroll down for all 51 trade classifications covered by this determination.

WD Number: MN20260067-15583-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Lincoln
Effective: May 17, 2026
Trades covered: 51
Official source: SAM.gov reference MN20260067View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $48.38 $26.38 $74.76 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.14 $27.60 $60.74 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $28.55 $14.03 $42.58 +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $39.81 $20.42 $60.23 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $44.54 $26.40 $70.94 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $33.66 $25.04 $58.70 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.48 $22.50 $67.98 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $13.50 $3.82 $17.32 $0.00 $0.00 $0.00 $0.00
GLAZIER $48.73 $23.50 $72.23 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $53.19 $31.95 $85.14 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.65 $29.40 $69.05 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.97 $24.46 $57.43 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $17.50 $0.00 $17.50 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $32.97 $24.46 $57.43 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LATHER $26.70 $15.98 $42.68 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $48.53 $26.40 $74.93 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.70 $31.81 $73.51 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $34.28 $24.83 $59.11 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $41.00 $14.42 $55.42 +38% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $40.14 $24.68 $64.82 Above median $0.00 $0.00 $0.00 $0.00
PLASTERER $24.00 $2.81 $26.81 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.00 $9.72 $39.72 -1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $48.89 $26.40 $75.29 +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $47.02 $26.88 $73.90 +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $22.66 $5.00 $27.66 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $42.94 $26.40 $69.34 +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $30.90 $19.45 $50.35 +33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $24.00 $10.00 $34.00 -10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $27.50 $3.50 $31.00 Bottom 10% -18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $27.90 $5.68 $33.58 -11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $25.90 $3.21 $29.11 -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $20.00 $1.50 $21.50 -43% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.40 $68.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROOFER $39.01 $21.93 $60.94 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.00 $4.17 $34.17 +14% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $37.83 $18.20 $56.03 +40% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $16.95 $13.48 $30.43 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $37.58 $16.83 $54.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $18.25 $5.99 $24.24 -18% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $18.25 $5.99 $24.24 -18% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $16.95 $13.48 $30.43 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $23.90 $0.00 $23.90 Bottom 10% -19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $21.00 $0.00 $21.00 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $18.28 $5.00 $23.28 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $20.00 $1.50 $21.50 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $32.01 $21.84 $53.85 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lincoln, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.