Davis-Bacon Wage Determinations — Lake of the Woods, Minnesota

Lake of the Woods has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Lake of the Woods, Minnesota cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: MN20260065-20043-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: MN20260232-20043-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: MN20260232-20043-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: MN20260013-20043-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Lake of the Woods

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 ELEVATOR CONSTRUCTORS building $59.95 $44.53 $104.48 WD →
2 BOILERMAKER heavy $48.35 $31.93 $80.28 WD →
3 MILLWRIGHT heavy $48.13 $29.41 $77.54 WD →
4 IRONWORKER building $41.19 $35.68 $76.87 WD →
5 GLAZIER building $48.98 $26.75 $75.73 WD →
6 PILEDRIVER heavy $45.71 $29.73 $75.44 WD →
7 Piledriver highway $45.71 $29.73 $75.44 WD →
8 HEATING AND FROST INSULATORS building $50.51 $23.45 $73.96 WD →
9 POWER EQUIPMENT OPERATOR building $47.02 $26.88 $73.90 WD →
10 POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE building $47.02 $26.88 $73.90 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →