WD MN20260063-15581-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Lac Qui Parle, Minnesota (construction type: building) is $17.50/hr base + $0.00/hr fringe = $17.50/hr total package (WD MN20260063-15581-bld, Rev. 1).

Scroll down for all 49 trade classifications covered by this determination.

WD Number: MN20260063-15581-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Lac Qui Parle
Effective: May 17, 2026
Trades covered: 49
Official source: SAM.gov reference MN20260063View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $17.50 $0.00 $17.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $41.94 $29.99 $71.93 +46% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $48.38 $26.38 $74.76 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.14 $27.60 $60.74 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $40.97 $8.84 $49.81 +63% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $44.54 $26.40 $70.94 $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $33.66 $25.04 $58.70 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.00 $30.00 $76.00 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $57.49 $43.71 $101.20 +79% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $53.19 $31.95 $85.14 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.97 $24.46 $57.43 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $16.50 $0.00 $16.50 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $32.97 $24.46 $57.43 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICLLY SEEDING, SODDING, OR PLANT, AND TWO-FRAM $11.13 $0.00 $11.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $48.35 $26.40 $74.75 Bottom 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.70 $31.81 $73.51 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $34.28 $24.83 $59.11 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $27.46 $16.11 $43.57 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $48.24 $34.70 $82.94 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $34.01 $21.84 $55.85 $0.00 $0.00 $0.00 $0.00
PLASTERER $18.00 $0.00 $18.00 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $51.04 $30.58 $81.62 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $43.35 $22.85 $66.20 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $47.02 $46.88 $93.90 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $41.38 $22.85 $64.23 +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $38.55 $22.85 $61.40 +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $30.90 $19.45 $50.35 +33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $40.00 $0.00 $40.00 +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $18.00 $1.50 $19.50 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $21.50 $1.25 $22.75 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $31.50 $0.00 $31.50 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $23.00 $19.70 $42.70 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.40 $68.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
ROOFER $21.00 $1.95 $22.95 -39% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.00 $5.89 $40.89 +36% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $32.17 $17.65 $49.82 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $19.69 $16.07 $35.76 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $31.58 $17.53 $49.11 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $19.69 $16.07 $35.76 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $23.90 $0.00 $23.90 Bottom 10% -19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $21.00 $0.00 $21.00 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $20.00 $1.50 $21.50 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $32.01 $21.84 $53.85 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lac Qui Parle, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.