Residential Construction — Koochiching, Minnesota

WD MN20260026-15528-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKERS/INSULATOR in Koochiching, Minnesota (construction type: residential) is $53.18/hr base + $23.83/hr fringe = $77.01/hr total package (WD MN20260026-15528-res, Rev. 1).

Scroll down for all 53 trade classifications covered by this determination.

WD Number: MN20260026-15528-res
Revision: 1
Construction Type: residential
State: Minnesota (MN)
County: Koochiching
Effective: May 17, 2026
Trades covered: 53
Official source: SAM.gov reference MN20260026View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKERS/INSULATOR $53.18 $23.83 $77.01 Above median +186% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.00 $31.14 $79.14 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $42.19 $31.19 $73.38 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $39.35 $26.73 $66.08 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (COOK, LAKE) $31.52 $17.64 $49.16 +58% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (KOOCHICHING, LAKE) $28.29 $22.88 $51.17 +65% vs market $0.00 $0.00 $0.00 $0.00
CARRIER $30.32 $21.69 $52.01 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $39.91 $21.63 $61.54 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM, SOUND, SIGNAL & COMMUNICATIONS WORK: INSTALLER. FOOTNOTES: A. 1 YEAR SERVICE - 5 DAYS PAID VACATION; 2 YEARS SERVICE - 10 DAYS $27.30 $14.31 $41.61 $0.00 $0.00 $0.00 $0.00
COMMUNICATIONS SYSTEM, SOUND, SIGNAL & COMMUNICATIONS WORK: TECHNICIAN. FOOTNOTES: A. 1 YEAR SERVICE - 5 DAYS PAID VACATION; 2 YEARS SERVICE - 10 DAYS $38.97 $17.14 $56.11 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.46 $33.34 $80.80 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS:: ALL OTHER WORK $45.83 $32.90 $78.73 +101% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS:: UP TO & INCLUDING 6-PLEX UNDER ONE ROOF $39.18 $29.68 $68.86 +76% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEAR $62.52 $38.44 $100.96 +78% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER: FOOTNOTE: 1 TO 4 YEARS' SERVICE - 1 WEEK'S PAID VACATION; 5 TO 11 YEARS SERVICE - 2 WEEKS PAID VACATION; 11 OR MORE YEARS SERVICE - 3 WEEKS P $30.17 $17.47 $47.64 +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.14 $34.11 $73.25 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 $20.62 $16.25 $36.87 Bottom 10% +31% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 $21.02 $16.25 $37.27 Bottom 10% +32% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 $21.32 $16.25 $37.57 Bottom 10% +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 $22.62 $16.25 $38.87 Bottom 10% +38% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 GENERAL; CARPENTER TENDER; CONCRETE LABORER; DAMP PROOFER BELOW GRADE; DRILL RUNNER TENDER; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMEN $29.92 $21.69 $51.61 +83% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING, EXCLUDING REMODELING; GUNITE, SANDBLASTI $30.07 $21.69 $51.76 +83% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTERS OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC.; A $30.62 $21.69 $52.31 +85% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER $26.89 $19.31 $46.20 Above median $0.00 $0.00 $0.00 $0.00
LATHER $33.55 $26.08 $59.63 Above median $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $45.47 $26.33 $71.80 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.55 $27.36 $67.91 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR AND/OR CONVEYOR OPERATOR; MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE OPERATOR; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER OPERATOR $44.91 $25.20 $70.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 1 HELICOPTER OPERATOR; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB; & TOWER CRANE 250' & OVER $49.25 $25.20 $74.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & O $48.88 $25.20 $74.08 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING OPERATOR; TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' O $47.35 $25.20 $72.55 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER; LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR; & TRACTOR OPERATOR WITH BOOM $46.99 $25.20 $72.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 MECHANICAL SPACE HEATER; OILER OR GREASER; & ELEVATOR OPERATOR $39.88 $25.20 $65.08 $0.00 $0.00 $0.00 $0.00
OPERATOR; BRAKEMAN; PICK-UP SWEEPER; TRUCK CRANE OILER; & WELDING MACHINE OPERATOR, FIREMAN TEMPORARY HEAT $42.06 $25.20 $67.26 $0.00 $0.00 $0.00 $0.00
PAINTER $28.96 $16.35 $45.31 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $28.36 $16.35 $44.71 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $30.72 $18.33 $49.05 +50% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $38.24 $23.23 $61.47 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTER, STEAMFITTER (COOK, LAKES) $52.24 $27.56 $79.80 +99% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $45.12 $23.15 $68.27 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $40.39 $20.53 $60.92 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.36 $24.25 $57.61 +92% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.85 $24.33 $54.18 +80% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $43.25 $24.19 $67.44 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $42.94 $27.26 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SUPERIOR), KOOCHICHING, LAKE) $48.55 $29.33 $77.88 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $25.23 $22.05 $47.28 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
TILE LAYER $32.54 $30.66 $63.20 $0.00 $0.00 $0.00 $0.00
TO 1 CU. YD $43.28 $25.20 $68.48 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 BOOM TRUCK $37.95 $24.13 $62.08 +111% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 READY MIX, TRACTOR TRAILOR $36.27 $24.13 $60.40 +106% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 FORK LIFT, MECHANIC, TANDEM OR 3 AXLE TRUCK $36.06 $24.13 $60.19 +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4 DUMPMAN, FARM TRACTOR, SINGLE OR 2 AXLE TRUCK $35.79 $24.13 $59.92 +104% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Koochiching, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Koochiching

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260026-15528-res →