Building Construction — Kittson, Minnesota
WD MN20260061-15527-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ARTICULATED HAULER in Kittson, Minnesota (construction type: building) is $17.00/hr base + $0.00/hr fringe = $17.00/hr total package (WD MN20260061-15527-bld, Rev. 1).
Scroll down for all 48 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ARTICULATED HAULER | $17.00 | $0.00 | $17.00 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS ABATEMENT WORKER | $18.94 | $6.92 | $25.86 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOOM TRUCK | $20.00 | $0.91 | $20.91 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $41.73 | $29.01 | $70.74 Above median +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $24.00 | $25.01 | $49.01 +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET LAYER | $23.47 | $15.67 | $39.14 -1% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON | $37.32 | $20.30 | $57.62 Above median +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER | $44.54 | $26.40 | $70.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL TAPER | $30.86 | $23.84 | $54.70 +82% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $36.15 | $17.96 | $54.11 +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR CONSTRUCTORS | $59.95 | $44.53 | $104.48 +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $48.98 | $26.75 | $75.73 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HEATING AND FROST INSULATORS | $33.00 | $6.34 | $39.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $41.19 | $35.68 | $76.87 Above median +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, GENERAL LABOR WORK | $25.62 | $22.71 | $48.33 Bottom 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL, GENERAL LABOR WORK | $30.14 | $22.76 | $52.90 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN | $25.62 | $22.71 | $48.33 Bottom 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN | $30.14 | $22.76 | $52.90 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET | $15.65 | $0.46 | $16.11 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $36.24 | $18.81 | $55.05 +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $31.63 | $25.28 | $56.91 Above median +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $26.54 | $17.03 | $43.57 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER/STEAMFITTER | $43.54 | $20.89 | $64.43 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $29.22 | $15.83 | $45.05 +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $43.54 | $20.89 | $64.43 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE | $47.02 | $26.88 | $73.90 +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE | $46.67 | $26.88 | $73.55 Above median +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE | $42.94 | $26.88 | $69.82 Above median +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER | $17.40 | $0.52 | $17.92 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED | $15.65 | $0.46 | $16.11 Bottom 10% -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC | $33.92 | $26.40 | $60.32 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O | $27.00 | $0.00 | $27.00 Bottom 10% -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN | $14.70 | $0.62 | $15.32 Bottom 10% -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S | $24.00 | $0.00 | $24.00 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR | $12.85 | $0.00 | $12.85 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $35.17 | $15.59 | $50.76 Above median +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $34.84 | $20.97 | $55.81 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SIGN ERECTOR | $27.10 | $13.42 | $40.52 | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $41.02 | $26.67 | $67.69 +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SURVEY FIELD TECHNICIAN | $11.13 | $1.80 | $12.93 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $15.66 | $4.27 | $19.93 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL PERSON | $11.13 | $1.80 | $12.93 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER | $21.50 | $0.00 | $21.50 Bottom 10% -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $21.50 | $0.00 | $21.50 Bottom 10% -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS | $15.00 | $4.00 | $19.00 Bottom 10% -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS | $13.50 | $9.75 | $23.25 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| WIRING SYSTEM TECHNICIAN | $31.00 | $7.98 | $38.98 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WIRING SYSTEMS INSTALLER | $31.25 | $16.63 | $47.88 | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Kittson, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Kittson
Compliance Notes
- This wage determination applies to federal contracts for building construction in Kittson, Minnesota.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.