Highway Construction — Kandiyohi, Minnesota

WD MN20260238-15580-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Kandiyohi, Minnesota (construction type: highway) is $42.49/hr base + $25.00/hr fringe = $67.49/hr total package (WD MN20260238-15580-hwy, Rev. 1).

Scroll down for all 40 trade classifications covered by this determination.

WD Number: MN20260238-15580-hwy
Revision: 1
Construction Type: highway
State: Minnesota (MN)
County: Kandiyohi
Effective: May 17, 2026
Trades covered: 40
Official source: SAM.gov reference MN20260238View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $42.49 $25.00 $67.49 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BLASTER $39.64 $24.24 $63.88 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $31.16 $23.45 $54.61 $0.00 $0.00 $0.00 $0.00
CARPENTER $42.85 $27.08 $69.93 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $43.00 $23.72 $66.72 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $45.61 $26.90 $72.51 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $23.10 $64.10 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $39.01 $26.01 $65.02 Above median $0.00 $0.00 $0.00 $0.00
GROUND PERSON $16.63 $6.38 $23.01 $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $17.50 $2.79 $20.29 $0.00 $0.00 $0.00 $0.00
IRONWORKER $46.00 $34.11 $80.11 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $39.01 $26.01 $65.02 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $39.01 $26.01 $65.02 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $30.04 $21.16 $51.20 Top 10% $0.00 $0.00 $0.00 $0.00
LINEMAN $50.86 $23.06 $73.92 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $38.23 $29.18 $67.41 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $41.29 $23.45 $64.74 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $33.91 $23.49 $57.40 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $33.91 $23.49 $57.40 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $41.97 $25.92 $67.89 +70% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $42.51 $26.01 $68.52 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $54.79 $30.58 $85.37 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $45.01 $26.90 $71.91 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $44.67 $26.90 $71.57 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $41.36 $26.90 $68.26 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.88 $25.10 $65.98 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $35.00 $11.50 $46.50 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $21.49 $14.80 $36.29 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $36.00 $11.50 $47.50 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $33.00 $11.50 $44.50 +52% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $31.00 $11.50 $42.50 +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $23.70 $6.91 $30.61 +4% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $38.14 $24.24 $62.38 Above median $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $40.51 $26.01 $66.52 Above median $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $41.42 $18.16 $59.58 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $29.02 $16.46 $45.48 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kandiyohi, MN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kandiyohi

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260238-15580-hwy →