WD MN20260059-15526-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS ABATEMENT WORKER in Kanabec, Minnesota (construction type: building) is $41.23/hr base + $25.99/hr fringe = $67.22/hr total package (WD MN20260059-15526-bld, Rev. 1).

Scroll down for all 58 trade classifications covered by this determination.

WD Number: MN20260059-15526-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Kanabec
Effective: May 17, 2026
Trades covered: 58
Official source: SAM.gov reference MN20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $41.39 $28.82 $70.21 +42% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $32.39 $11.74 $44.13 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $45.27 $31.79 $77.06 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $45.54 $29.34 $74.88 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $45.25 $26.98 $72.23 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $51.21 $25.47 $76.68 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $41.72 $29.72 $71.44 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $58.31 $36.48 $94.79 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $59.95 $44.53 $104.48 +85% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $30.91 $20.94 $51.85 Above median $0.00 $0.00 $0.00 $0.00
FLAG PERSON $29.16 $20.94 $50.10 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $36.49 $21.85 $58.34 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $35.66 $25.17 $60.83 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, GENERAL LABOR WORK $37.41 $25.21 $62.62 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $31.66 $22.78 $54.44 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN $35.66 $25.17 $60.83 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED, ASSISTING SKILLED CRAFT JOURNEYMAN $37.41 $25.21 $62.62 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICLLY SEEDING, SODDING, OR PLANT, AND TWO-FRAM $31.66 $22.78 $54.44 Top 10% $0.00 $0.00 $0.00 $0.00
LATHER $47.00 $26.85 $73.85 Top 10% $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $50.64 $26.90 $77.54 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.00 $27.69 $71.69 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $49.24 $27.18 $76.42 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $42.51 $26.01 $68.52 Above median $0.00 $0.00 $0.00 $0.00
PLASTERER $41.83 $22.79 $64.62 Above median +97% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $49.24 $27.18 $76.42 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $44.44 $21.70 $66.14 Bottom 10% +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $49.05 $26.90 $75.95 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $48.68 $26.40 $75.08 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $44.82 $26.40 $71.22 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $16.10 $6.00 $22.10 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $40.56 $25.00 $65.56 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $22.95 $0.69 $23.64 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $31.16 $23.45 $54.61 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $28.35 $6.91 $35.26 -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $22.50 $6.91 $29.41 -22% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $43.55 $26.90 $70.45 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $41.06 $22.68 $63.74 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $57.96 $34.57 $92.53 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $37.19 $19.88 $57.07 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, +$950,000 $32.11 $21.69 $53.80 Top 10% $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN, -$950,000 $30.36 $21.69 $52.05 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $48.27 $24.14 $72.41 Above median $0.00 $0.00 $0.00 $0.00
TILE FINISHER $29.45 $20.33 $49.78 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $42.76 $30.32 $73.08 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $16.10 $6.00 $22.10 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $25.50 $0.77 $26.27 Bottom 10% -11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $24.10 $6.91 $31.01 +6% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $22.35 $6.76 $29.11 -1% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $21.00 $6.76 $27.76 -5% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $40.51 $26.01 $66.52 Above median $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kanabec, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kanabec

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260059-15526-bld →