Highway Construction — Isanti, Minnesota
WD MN20260235-15557-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ARTICULATED HAULER in Isanti, Minnesota (construction type: highway) is $44.67/hr base + $26.90/hr fringe = $71.57/hr total package (WD MN20260235-15557-hwy, Rev. 1).
Scroll down for all 41 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ARTICULATED HAULER | $44.67 | $26.90 | $71.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS ABATEMENT WORKER | $39.86 | $24.11 | $63.97 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BLASTER | $28.11 | $16.57 | $44.68 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $46.00 | $31.93 | $77.93 +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOOM TRUCK | $47.25 | $26.90 | $74.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $36.49 | $20.24 | $56.73 Above median +32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $49.82 | $29.92 | $79.74 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON | $51.23 | $26.22 | $77.45 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING | $45.61 | $26.90 | $72.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $60.40 | $34.39 | $94.79 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLAG PERSON | $44.00 | $26.12 | $70.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GROUND PERSON | $35.60 | $18.55 | $54.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HEATING AND FROST INSULATORS | $43.90 | $23.05 | $66.95 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $44.85 | $35.72 | $80.57 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $44.00 | $26.12 | $70.12 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $30.04 | $21.16 | $51.20 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SKILLED | $44.00 | $26.12 | $70.12 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA | $30.04 | $21.16 | $51.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LINEMAN | $50.86 | $23.06 | $73.92 Above median +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $37.13 | $30.28 | $67.41 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OFF-ROAD TRUCK | $44.67 | $26.90 | $71.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $45.50 | $27.69 | $73.19 Top 10% +150% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) | $38.90 | $23.49 | $62.39 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $49.46 | $30.23 | $79.69 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER/STEAMFITTER | $55.68 | $34.76 | $90.44 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPELAYER | $45.13 | $24.74 | $69.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $61.28 | $31.52 | $92.80 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C | $45.01 | $26.90 | $71.91 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT | $44.67 | $26.90 | $71.57 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND | $41.36 | $26.90 | $68.26 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.88 | $25.10 | $65.98 Above median +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SURVEY FIELD TECHNICIAN | $44.00 | $26.12 | $70.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL PERSON | $44.00 | $26.12 | $70.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER | $28.00 | $0.84 | $28.84 Bottom 10% -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $26.00 | $0.00 | $26.00 Bottom 10% -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS | $26.50 | $13.00 | $39.50 +34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS | $22.00 | $6.91 | $28.91 -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL MINER | $23.07 | $15.03 | $38.10 | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDERGROUND AND OPEN DITCH LABORER | $45.50 | $26.12 | $71.62 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WIRING SYSTEM TECHNICIAN | $47.73 | $22.24 | $69.97 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WIRING SYSTEMS INSTALLER | $31.25 | $16.34 | $47.59 | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Isanti, MN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Isanti
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Isanti, Minnesota.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.