Highway Construction — Isanti, Minnesota

WD MN20260235-15557-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Isanti, Minnesota (construction type: highway) is $44.67/hr base + $26.90/hr fringe = $71.57/hr total package (WD MN20260235-15557-hwy, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: MN20260235-15557-hwy
Revision: 1
Construction Type: highway
State: Minnesota (MN)
County: Isanti
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference MN20260235View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $39.86 $24.11 $63.97 Above median $0.00 $0.00 $0.00 $0.00
BLASTER $28.11 $16.57 $44.68 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.00 $31.93 $77.93 +58% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $47.25 $26.90 $74.15 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $36.49 $20.24 $56.73 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $49.82 $29.92 $79.74 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $51.23 $26.22 $77.45 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $45.61 $26.90 $72.51 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $60.40 $34.39 $94.79 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $44.00 $26.12 $70.12 Top 10% $0.00 $0.00 $0.00 $0.00
GROUND PERSON $35.60 $18.55 $54.15 Top 10% $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $43.90 $23.05 $66.95 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $44.00 $26.12 $70.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $44.00 $26.12 $70.12 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $30.04 $21.16 $51.20 Top 10% $0.00 $0.00 $0.00 $0.00
LINEMAN $50.86 $23.06 $73.92 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.13 $30.28 $67.41 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $45.50 $27.69 $73.19 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $38.90 $23.49 $62.39 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $55.68 $34.76 $90.44 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $45.13 $24.74 $69.87 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $61.28 $31.52 $92.80 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $45.01 $26.90 $71.91 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $44.67 $26.90 $71.57 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $41.36 $26.90 $68.26 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.88 $25.10 $65.98 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $44.00 $26.12 $70.12 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $44.00 $26.12 $70.12 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $28.00 $0.84 $28.84 Bottom 10% -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $26.00 $0.00 $26.00 Bottom 10% -11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $26.50 $13.00 $39.50 +34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $22.00 $6.91 $28.91 -2% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $23.07 $15.03 $38.10 $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $45.50 $26.12 $71.62 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $16.34 $47.59 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Isanti, MN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Isanti

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260235-15557-hwy →