Building Construction — Grant, Minnesota

WD MN20260052-15577-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Grant, Minnesota (construction type: building) is $18.75/hr base + $0.00/hr fringe = $18.75/hr total package (WD MN20260052-15577-bld, Rev. 1).

Scroll down for all 55 trade classifications covered by this determination.

WD Number: MN20260052-15577-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Grant
Effective: May 17, 2026
Trades covered: 55
Official source: SAM.gov reference MN20260052View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $18.75 $0.00 $18.75 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.00 $31.93 $77.93 +58% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $20.00 $0.91 $20.91 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.73 $29.01 $70.74 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.14 $27.60 $60.74 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $27.15 $17.38 $44.53 +13% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $37.97 $20.75 $58.72 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $39.17 $21.70 $60.87 Bottom 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $33.76 $23.84 $57.60 +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $23.10 $64.10 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $29.53 $20.62 $50.15 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $38.00 $4.00 $42.00 +30% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $36.06 $24.39 $60.45 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $17.00 $2.00 $19.00 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $36.06 $24.39 $60.45 +114% vs market $0.00 $0.00 $0.00 $0.00
LATHER $28.34 $23.70 $52.04 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $48.53 $26.88 $75.41 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $34.13 $30.28 $64.41 +93% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $34.23 $25.28 $59.51 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $27.16 $15.24 $42.40 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $45.71 $29.73 $75.44 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $43.54 $20.89 $64.43 +61% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $29.75 $19.94 $49.69 $0.00 $0.00 $0.00 $0.00
PLASTERER $30.72 $18.33 $49.05 +50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.54 $20.89 $64.43 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $43.35 $22.85 $66.20 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $47.02 $26.88 $73.90 +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $40.58 $21.70 $62.28 +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $37.75 $21.70 $59.45 +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $30.90 $19.45 $50.35 +33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $31.50 $0.00 $31.50 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $33.92 $26.40 $60.32 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $38.00 $0.00 $38.00 +1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $33.00 $0.00 $33.00 -13% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $14.00 $0.00 $14.00 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $41.73 $26.88 $68.61 $0.00 $0.00 $0.00 $0.00
ROOFER $41.06 $22.68 $63.74 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $48.15 $29.12 $77.27 Above median +157% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $37.19 $19.88 $57.07 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $37.58 $16.83 $54.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE SETTER $30.66 $10.53 $41.19 +39% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $28.00 $0.84 $28.84 Bottom 10% -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $26.00 $0.00 $26.00 Bottom 10% -11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $23.66 $16.20 $39.86 +36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $20.14 $0.00 $20.14 Bottom 10% -31% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $26.10 $19.14 $45.24 Bottom 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $44.61 $20.17 $64.78 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $31.25 $15.83 $47.08 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grant, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.