Heavy Construction — Goodhue, Minnesota

WD MN20260236-15576-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Goodhue, Minnesota (construction type: heavy) is $44.67/hr base + $26.90/hr fringe = $71.57/hr total package (WD MN20260236-15576-hvy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: MN20260236-15576-hvy
Revision: 1
Construction Type: heavy
State: Minnesota (MN)
County: Goodhue
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference MN20260236View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $44.67 $26.90 $71.57 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $36.23 $22.26 $58.49 $0.00 $0.00 $0.00 $0.00
BLASTER $42.01 $26.01 $68.02 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $47.25 $26.90 $74.15 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $36.05 $19.68 $55.73 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $49.82 $29.92 $79.74 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $35.32 $14.03 $49.35 Above median +25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $57.21 $13.26 $70.47 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $45.61 $26.90 $72.51 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.37 $26.13 $74.50 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $39.01 $26.01 $65.02 Above median $0.00 $0.00 $0.00 $0.00
GROUND PERSON $33.40 $16.30 $49.70 Above median $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $43.90 $23.05 $66.95 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $39.01 $26.01 $65.02 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $39.01 $26.01 $65.02 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $30.04 $21.16 $51.20 Top 10% $0.00 $0.00 $0.00 $0.00
LINEMAN $46.32 $20.12 $66.44 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.70 $31.81 $73.51 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $44.67 $26.40 $71.07 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $34.78 $24.83 $59.61 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $33.91 $23.49 $57.40 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $55.94 $34.50 $90.44 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $42.51 $26.01 $68.52 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $50.16 $28.23 $78.39 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $45.01 $26.90 $71.91 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $44.67 $26.90 $71.57 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $41.36 $26.90 $68.26 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $57.96 $34.57 $92.53 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $28.18 $20.07 $48.25 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $30.51 $21.84 $52.35 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $33.00 $14.40 $47.40 +61% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $54.24 $0.01 $54.25 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $32.00 $13.00 $45.00 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $35.74 $21.76 $57.50 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $33.51 $22.39 $55.90 $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $40.51 $26.01 $66.52 Above median $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $26.49 $12.40 $38.89 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Goodhue, MN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.