Building Construction — Faribault, Minnesota

WD MN20260048-15573-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Faribault, Minnesota (construction type: building) is $17.50/hr base + $6.00/hr fringe = $23.50/hr total package (WD MN20260048-15573-bld, Rev. 1).

Scroll down for all 57 trade classifications covered by this determination.

WD Number: MN20260048-15573-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Faribault
Effective: May 17, 2026
Trades covered: 57
Official source: SAM.gov reference MN20260048View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $17.50 $6.00 $23.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BLASTER $23.87 $17.67 $41.54 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $35.25 $5.46 $40.71 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $46.47 $27.12 $73.59 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.55 $29.03 $65.58 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $39.58 $24.45 $64.03 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $46.41 $27.12 $73.53 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $35.71 $25.04 $60.75 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.48 $22.50 $67.98 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $27.85 $21.17 $49.02 $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.50 $24.15 $58.65 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $31.66 $22.78 $54.44 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $34.50 $24.15 $58.65 Bottom 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $33.80 $12.06 $45.86 $0.00 $0.00 $0.00 $0.00
LATHER $27.27 $12.46 $39.73 Above median $0.00 $0.00 $0.00 $0.00
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET $50.64 $26.90 $77.54 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $36.33 $24.83 $61.16 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $27.26 $16.59 $43.85 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $48.06 $30.33 $78.39 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $35.00 $8.75 $43.75 $0.00 $0.00 $0.00 $0.00
PLASTERER $17.00 $2.89 $19.89 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $48.06 $30.33 $78.39 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $51.03 $26.40 $77.43 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $49.05 $26.90 $75.95 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $48.68 $26.90 $75.58 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $29.39 $17.00 $46.39 +23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $41.28 $26.40 $67.68 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $35.00 $8.75 $43.75 +16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $38.00 $8.75 $46.75 +24% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $36.25 $8.75 $45.00 +19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $38.99 $26.40 $65.39 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $26.00 $8.75 $34.75 -8% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $43.55 $26.90 $70.45 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $41.00 $4.79 $45.79 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.00 $6.59 $41.59 +38% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $37.19 $19.88 $57.07 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.53 $26.67 $70.20 +75% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $31.00 $7.50 $38.50 $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $40.53 $19.83 $60.36 $0.00 $0.00 $0.00 $0.00
TILE FINISHER $33.25 $0.67 $33.92 +14% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.75 $0.82 $41.57 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $33.00 $8.75 $41.75 +42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $33.00 $8.75 $41.75 +42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $24.00 $6.50 $30.50 +4% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $18.00 $6.00 $24.00 -18% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $33.51 $22.39 $55.90 $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Faribault, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.