Residential Construction — Dodge, Minnesota

WD MN20260025-15571-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Dodge, Minnesota (construction type: residential) is $36.71/hr base + $20.17/hr fringe = $56.88/hr total package (WD MN20260025-15571-res, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: MN20260025-15571-res
Revision: 1
Construction Type: residential
State: Minnesota (MN)
County: Dodge
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference MN20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $36.71 $20.17 $56.88 +83% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.25 $23.32 $63.57 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $46.35 $36.86 $83.21 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $32.75 $22.82 $55.57 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $27.25 $17.52 $44.77 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.50 $0.00 $11.50 -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $30.87 $22.82 $53.69 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $25.42 $17.52 $42.94 Top 10% +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $33.45 $22.82 $56.27 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $27.95 $17.52 $45.47 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE $34.85 $15.95 $50.80 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE $33.10 $15.95 $49.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2 $32.93 $15.95 $48.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE $31.42 $15.95 $47.37 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT GROUP 8 OILER $28.29 $15.95 $44.24 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY. PROJECTS UNDER $600,000 RECEIVE 85% OF THE BASIC HOURLY RATE $29.66 $16.94 $46.60 +59% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.96 $36.58 $80.54 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.71 $16.99 $49.70 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
ROOFER FOOTNOTE: PAID HOLIDAY - LABOR DAY $48.32 $25.54 $73.86 +98% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $35.61 $26.05 $61.66 Above median +105% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dodge, MN — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dodge

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260025-15571-res →