Heavy Construction — Brown, Minnesota

WD MN20260240-15568-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Brown, Minnesota (construction type: heavy) is $42.49/hr base + $25.00/hr fringe = $67.49/hr total package (WD MN20260240-15568-hvy, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: MN20260240-15568-hvy
Revision: 1
Construction Type: heavy
State: Minnesota (MN)
County: Brown
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference MN20260240View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $42.49 $25.00 $67.49 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $36.23 $22.26 $58.49 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $35.15 $27.02 $62.17 +26% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $30.21 $22.55 $52.76 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $23.44 $4.18 $27.62 -36% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $42.85 $27.08 $69.93 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $47.78 $22.69 $70.47 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $34.94 $26.79 $61.73 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.00 $10.46 $52.46 +34% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $39.01 $26.01 $65.02 Above median $0.00 $0.00 $0.00 $0.00
GROUND PERSON $18.00 $0.00 $18.00 $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $16.00 $0.00 $16.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $39.01 $26.01 $65.02 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $30.04 $21.16 $51.20 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $39.01 $26.01 $65.02 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $25.88 $16.57 $42.45 $0.00 $0.00 $0.00 $0.00
LINEMAN $16.50 $0.00 $16.50 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.90 $77.56 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $25.31 $19.70 $45.01 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $33.91 $23.49 $57.40 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $33.91 $23.49 $57.40 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $34.64 $19.70 $54.34 Bottom 10% +36% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $42.51 $26.01 $68.52 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $34.00 $6.88 $40.88 +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $33.92 $26.79 $60.71 Bottom 10% +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $33.58 $26.79 $60.37 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $31.71 $26.79 $58.50 Bottom 10% +55% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $28.40 $16.65 $45.05 +50% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $30.51 $21.84 $52.35 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $20.94 $11.11 $32.05 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $36.00 $11.50 $47.50 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $36.25 $17.45 $53.70 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $31.00 $11.50 $42.50 +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $37.54 $21.36 $58.90 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $38.14 $24.24 $62.38 Above median $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $38.14 $24.68 $62.82 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Brown, MN — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Brown

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260240-15568-hvy →