Highway Construction — Beltrami, Minnesota

WD MN20260232-15517-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Beltrami, Minnesota (construction type: highway) is $33.58/hr base + $26.79/hr fringe = $60.37/hr total package (WD MN20260232-15517-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: MN20260232-15517-hwy
Revision: 1
Construction Type: highway
State: Minnesota (MN)
County: Beltrami
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference MN20260232View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $33.58 $26.79 $60.37 $0.00 $0.00 $0.00 $0.00
BLASTER $17.98 $5.92 $23.90 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $36.58 $26.79 $63.37 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $29.89 $14.40 $44.29 +3% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $41.69 $28.29 $69.98 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $41.40 $21.17 $62.57 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
CRAWLER, HYDRAULIC BACKHOE AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING $34.94 $26.79 $61.73 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.38 $30.31 $72.69 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
FLAG PERSON $27.50 $20.74 $48.24 $0.00 $0.00 $0.00 $0.00
GROUND PERSON $11.13 $0.00 $11.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $19.50 $1.30 $20.80 $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.19 $35.68 $76.87 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.50 $24.26 $58.76 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $24.00 $2.00 $26.00 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $34.50 $24.26 $58.76 +108% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $26.00 $0.00 $26.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
LINEMAN $20.00 $0.00 $20.00 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $48.13 $29.41 $77.54 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $33.58 $26.79 $60.37 $0.00 $0.00 $0.00 $0.00
PAINTER $29.83 $21.77 $51.60 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS) $35.00 $13.24 $48.24 Bottom 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $45.71 $29.73 $75.44 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $45.94 $20.89 $66.83 +67% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $38.00 $24.26 $62.26 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $30.00 $0.00 $30.00 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK; DRAGLINE, C $33.92 $26.79 $60.71 Bottom 10% +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BIT $33.58 $26.79 $60.37 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND $31.71 $26.79 $58.50 Bottom 10% +55% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.84 $20.97 $55.81 +86% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $20.33 $3.17 $23.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $21.39 $14.90 $36.29 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $33.55 $24.70 $58.25 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $32.95 $24.70 $57.65 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $32.79 $24.70 $57.49 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $32.79 $24.70 $57.49 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $29.00 $20.74 $49.74 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Beltrami, MN — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Beltrami

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MN20260232-15517-hwy →