Quick Answer

The Davis-Bacon prevailing wage for ARTICULATED HAULER in Anoka, Minnesota (construction type: building) is $46.99/hr base + $25.20/hr fringe = $72.19/hr total package (WD MN20260028-15552-bld, Rev. 1).

Scroll down for all 60 trade classifications covered by this determination.

WD Number: MN20260028-15552-bld
Revision: 1
Construction Type: building
State: Minnesota (MN)
County: Anoka
Effective: May 17, 2026
Trades covered: 60
Official source: SAM.gov reference MN20260028View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ARTICULATED HAULER $46.99 $25.20 $72.19 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS ABATEMENT WORKER $41.23 $25.99 $67.22 Top 10% $0.00 $0.00 $0.00 $0.00
BLASTER $34.26 $18.54 $52.80 Above median $0.00 $0.00 $0.00 $0.00
BOILERMAKER $48.35 $31.93 $80.28 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
BOOM TRUCK $46.51 $26.40 $72.91 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $48.23 $26.53 $74.76 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $45.54 $29.34 $74.88 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $45.25 $26.98 $72.23 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $51.21 $25.47 $76.68 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
DRUMS); MECHANIC; POWER PLANT; PUMP OPERATOR AND/OR CONVEYOR; SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER $46.51 $26.90 $73.41 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $41.72 $29.72 $71.44 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $58.31 $36.48 $94.79 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $62.52 $45.36 $107.88 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
FEET, INCLUDING JIB $50.64 $26.90 $77.54 $0.00 $0.00 $0.00 $0.00
FLAG PERSON $43.39 $24.74 $68.13 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $48.98 $26.75 $75.73 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
HEATING AND FROST INSULATORS $57.24 $31.95 $89.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.85 $35.72 $80.57 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $43.39 $24.74 $68.13 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $31.66 $22.78 $54.44 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $43.39 $24.74 $68.13 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRA $31.66 $22.78 $54.44 Top 10% $0.00 $0.00 $0.00 $0.00
LATHER $47.00 $26.85 $73.85 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $41.66 $35.40 $77.06 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
OFF-ROAD TRUCK $41.73 $22.85 $64.58 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $44.00 $27.69 $71.69 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT (; SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) $37.05 $19.39 $56.44 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER $49.46 $30.23 $79.69 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER/STEAMFITTER $53.48 $36.96 $90.44 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
PIPELAYER $47.50 $26.12 $73.62 Top 10% $0.00 $0.00 $0.00 $0.00
PLASTERER $47.93 $25.34 $73.27 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $61.28 $31.52 $92.80 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INC $51.03 $26.90 $77.93 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 3: ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164 FEET; DERRICK; SELF-ERECTING TOWER CRANE $49.05 $26.90 $75.95 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER; LOCOMOTIVE; OVE $48.68 $26.90 $75.58 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 6: CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE $44.82 $26.90 $71.72 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER $41.28 $26.90 $68.18 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED $45.61 $26.90 $72.51 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3: ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK; DREDGE OR ENGINEERS, DREDGE AND ENGINEER; LOC $45.01 $26.90 $71.91 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4: AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE; BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED O $44.67 $26.90 $71.57 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5: BITUMINOUS ROLLER; CONCRETE SAW; FORM TRENCH DIGGER; HYDRAULIC LOG SPLITTER; LOADER; POST HOLE DRIVIN $41.36 $26.90 $68.26 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6: CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; DREDGE DECK HAND; GRAVEL S $40.02 $26.40 $66.42 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE; OILER; PICK UP SWEEPER; PUMP AND/OR CONVEYOR $43.55 $26.90 $70.45 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $45.70 $24.84 $70.54 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $57.96 $34.57 $92.53 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
SIGN ERECTOR $37.19 $19.88 $57.07 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $59.81 $34.85 $94.66 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
SURVEY FIELD TECHNICIAN $43.39 $24.74 $68.13 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER $46.27 $26.64 $72.91 Top 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $35.15 $24.36 $59.51 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $42.76 $30.32 $73.08 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $43.39 $24.74 $68.13 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER $32.85 $9.02 $41.87 +43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK $38.39 $23.70 $62.09 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR; THREE AXLE UNITS $22.50 $6.50 $29.00 -1% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 4: BITUMINOUS DISTRIBUTOR SPRAY OPERATOR; DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS $28.00 $9.56 $37.56 +28% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL MINER $43.13 $24.24 $67.37 Above median $0.00 $0.00 $0.00 $0.00
UNDERGROUND AND OPEN DITCH LABORER $45.50 $26.12 $71.62 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEM TECHNICIAN $47.73 $22.24 $69.97 Top 10% $0.00 $0.00 $0.00 $0.00
WIRING SYSTEMS INSTALLER $33.44 $17.82 $51.26 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Anoka, MN — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.