Building Construction — Wayne, Michigan

WD MI20260101-15468-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Wayne, Michigan (construction type: building) is $40.74/hr base + $32.59/hr fringe = $73.33/hr total package (WD MI20260101-15468-bld, Rev. 1).

Scroll down for all 44 trade classifications covered by this determination.

WD Number: MI20260101-15468-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Wayne
Effective: May 17, 2026
Trades covered: 44
Official source: SAM.gov reference MI20260101View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.74 $32.59 $73.33 Above median +234% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.66 $26.53 $68.19 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $42.44 $31.43 $73.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $36.76 $21.11 $57.87 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.63 $14.07 $44.70 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $65.01 $38.44 $103.45 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.32 $28.54 $79.86 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS $39.93 $17.97 $57.90 +66% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS W $42.00 $25.55 $67.55 +142% vs market $0.00 $0.00 $0.00 $0.00
INSTALLER - OVERHEAD DOOR $27.98 $0.00 $27.98 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $30.02 $27.43 $57.45 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER $38.00 $18.25 $56.25 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $39.08 $15.92 $55.00 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER $29.93 $9.10 $39.03 +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDE $27.71 $9.10 $36.81 +57% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $51.29 $25.35 $76.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $48.79 $25.35 $74.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $48.29 $25.35 $73.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.99 $25.35 $73.34 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.17 $25.35 $72.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR, AND CONCRETE PUMP WITH BOOM OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR $46.31 $25.35 $71.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID LOADER, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, HIGHLIFT, HOIST, LOADER, RO $45.34 $25.35 $70.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COM $43.63 $25.35 $68.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND $35.29 $25.35 $60.64 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.86 $17.66 $44.52 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION $41.96 $40.85 $82.81 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $30.63 $14.07 $44.70 +51% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $43.34 $32.92 $76.26 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $42.68 $28.75 $71.43 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $42.51 $35.77 $78.28 Above median +164% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $53.57 $33.95 $87.52 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $33.50 $23.52 $57.02 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $23.62 $64.15 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 FLATBED; PICKUP; DUMP & TANDEM PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CH $31.03 $0.70 $31.73 +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 2 SEMI PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE $31.18 $0.70 $31.88 +20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF T $31.28 $0.70 $31.98 +21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 Above median -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Wayne, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.