Quick Answer

The Davis-Bacon prevailing wage for AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER in Washtenaw, Michigan (construction type: heavy) is $29.93/hr base + $9.10/hr fringe = $39.03/hr total package (WD MI20260074-15439-hvy, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: MI20260074-15439-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Washtenaw
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference MI20260074View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER $29.93 $9.10 $39.03 Top 10% $0.00 $0.00 $0.00 $0.00
BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM $47.17 $25.35 $72.52 Bottom 10% $0.00 $0.00 $0.00 $0.00
BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM $47.99 $25.35 $73.34 $0.00 $0.00 $0.00 $0.00
BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM $48.29 $25.35 $73.64 Above median $0.00 $0.00 $0.00 $0.00
BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM $49.79 $25.35 $75.14 Above median $0.00 $0.00 $0.00 $0.00
BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM $51.29 $25.35 $76.64 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $42.44 $31.43 $73.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.23 $22.11 $54.34 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $56.05 $30.52 $86.57 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $25.20 $12.95 $38.15 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $25.50 $12.95 $38.45 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( LANDSCAPE) $19.59 $12.95 $32.54 +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $22.11 $12.95 $35.06 +50% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( PIPELAYER) $25.65 $12.95 $38.60 +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 1 COMMON OR GENERAL; GRADE CHECKER $38.11 $15.45 $53.56 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 2 MASON TENDER - CEMENT/CONCRETE $38.33 $15.45 $53.78 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 3 PIPELAYER $38.47 $15.45 $53.92 +130% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RA $46.31 $25.35 $71.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER $45.34 $25.35 $70.69 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED $43.63 $25.35 $68.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY $35.29 $25.35 $60.64 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $25.06 $14.75 $39.81 +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $25.86 $14.75 $40.61 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $44.31 $23.70 $68.01 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPE $45.98 $25.25 $71.23 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.40 $0.75 $34.15 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER $33.50 $0.75 $34.25 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.65 $0.75 $34.40 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51 Above median -8% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washtenaw, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.