Residential Construction — Tuscola, Michigan

WD MI20260005-15486-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Tuscola, Michigan (construction type: residential) is $35.83/hr base + $22.18/hr fringe = $58.01/hr total package (WD MI20260005-15486-res, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: MI20260005-15486-res
Revision: 1
Construction Type: residential
State: Michigan (MI)
County: Tuscola
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference MI20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $35.83 $22.18 $58.01 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.86 $23.69 $59.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.55 $6.35 $25.90 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.00 $23.13 $60.13 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.31 $23.03 $58.34 +67% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.62 $13.70 $49.32 +41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE $27.68 $13.45 $41.13 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY $44.00 $25.25 $69.25 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $13.44 $2.17 $15.61 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $14.36 $1.98 $16.34 -31% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $30.45 $10.64 $41.09 +11% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.50 $22.10 $65.60 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.38 $19.87 $50.25 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $19.29 $7.22 $26.51 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.00 $1.25 $13.25 -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Tuscola, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Tuscola

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260005-15486-res →