Highway Construction — Oscoda, Michigan
WD MI20260001-15457-hwy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER: PILEDRIVER in Oscoda, Michigan (construction type: highway) is $35.57/hr base + $21.54/hr fringe = $57.11/hr total package (WD MI20260001-15457-hwy, Rev. 2).
Scroll down for all 160 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER: PILEDRIVER | $35.57 | $21.54 | $57.11 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: PILEDRIVER (LIVINGSTON, MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES) | $41.37 | $28.69 | $70.06 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: ZONE 1 (ZONE 1: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES ZONE 2: ALCONA, AL | $33.00 | $18.51 | $51.51 Top 10% +81% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER: ZONE 2 (ZONE 1: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES ZONE 2: ALCONA, AL | $31.50 | $18.51 | $50.01 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND | $50.97 | $28.25 | $79.22 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND | $52.15 | $28.25 | $80.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND | $52.42 | $28.25 | $80.67 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND | $53.92 | $28.25 | $82.17 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND | $55.42 | $28.25 | $83.67 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FLAG PERSON | $10.10 | $0.00 | $10.10 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $23.70 | $6.95 | $30.65 Top 10% +0% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: ALLEGAN, ANTRIM, BARRY, BENZIE, BRANCH, CALHOUN, CHARLEVOIX, EATON, EMMET, GRAND TRAVERSE, HILLSDA | $28.80 | $27.43 | $56.23 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: BAY, GENESEE, LAPEER, LIVINGSTON, MACOMB, MIDLAND, OAKLAND, SAGINAW, ST. CLAIR, THE UNIVERSITY OF | $30.02 | $28.13 | $58.15 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ALL OTHER WORK | $33.00 | $27.20 | $60.20 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: GENERAL CONTRACTS $10,000,000 OR GREATER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DA | $39.91 | $32.32 | $72.23 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: GENERAL CONTRACTS LESS THAN $10,000,000 PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: INCLUDING PRE-ENGINEERED METAL BUILDING ERECTOR | $31.75 | $22.84 | $54.59 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $36.55 | $35.93 | $72.48 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.55 | $32.87 | $69.42 Above median +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 1: GROUP 1 | $35.51 | $14.45 | $49.96 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 1: GROUP 2 | $31.96 | $14.45 | $46.41 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 1: GROUP 3 | $35.82 | $14.45 | $50.27 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 1: GROUP 4 | $35.90 | $14.45 | $50.35 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 1: GROUP 5 | $36.11 | $14.45 | $50.56 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 1: GROUP 6 | $36.41 | $14.45 | $50.86 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 2: GROUP 1 | $33.37 | $14.45 | $47.82 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 2: GROUP 2 | $30.03 | $14.45 | $44.48 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 2: GROUP 3 | $33.81 | $14.45 | $48.26 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 2: GROUP 4 | $34.16 | $14.45 | $48.61 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 2: GROUP 5 | $34.03 | $14.45 | $48.48 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 2: GROUP 6 | $34.37 | $14.45 | $48.82 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 3: GROUP 1 | $32.62 | $14.45 | $47.07 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 3: GROUP 2 | $33.83 | $14.45 | $48.28 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 3: GROUP 3 | $33.12 | $14.45 | $47.57 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 3: GROUP 4 | $33.56 | $14.45 | $48.01 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 3: GROUP 5 | $33.18 | $14.45 | $47.63 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 3: GROUP 6 | $33.61 | $14.45 | $48.06 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 4: GROUP 1 | $33.52 | $13.45 | $46.97 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 4: GROUP 2 | $33.73 | $13.45 | $47.18 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 4: GROUP 3 | $34.02 | $13.45 | $47.47 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 4: GROUP 4 | $34.46 | $13.45 | $47.91 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 4: GROUP 5 | $34.08 | $13.45 | $47.53 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, AREA 4: GROUP 6 | $34.51 | $13.45 | $47.96 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DISTRIBUTION WORK: ZONE 1 - MACOMB, OAKLAND AND WAYNE DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DIST | $28.41 | $13.45 | $41.86 Top 10% +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DISTRIBUTION WORK: ZONE 2 - MONROE AND WASHTENAW DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF DISTRIBUT | $24.55 | $13.45 | $38.00 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DISTRIBUTION WORK: ZONE 3 - BAY, GENESEE, LAPEER, MIDLAND, SAGINAW, SANILAC, SHIAWASSEE AND ST. CLAIR DISTRIBUTION WORK - THE CONSTRUCTION, I | $23.55 | $13.45 | $37.00 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DISTRIBUTION WORK: ZONE 4 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINE | $22.92 | $13.45 | $36.37 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DISTRIBUTION WORK: ZONE 5 - REMAINING COUNTIES IN MICHIGAN DISTRIBUTION WORK - THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF | $22.95 | $13.45 | $36.40 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class a | $17.64 | $12.90 | $30.54 Top 10% +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: class b | $18.64 | $12.90 | $31.54 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMI | $25.18 | $12.90 | $38.08 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY; KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA | $21.88 | $13.26 | $35.14 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES | $23.74 | $12.95 | $36.69 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY; LIVINGSTON COUNTY - ZONE 6 | $26.33 | $12.95 | $39.28 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 | $24.20 | $13.80 | $38.00 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIR | $23.20 | $13.80 | $37.00 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 | $27.13 | $14.95 | $42.08 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY; AND WASHTENAW COUNTY - ZONE 3 | $29.93 | $14.20 | $44.13 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY; AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIR | $28.93 | $14.20 | $43.13 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF | $29.93 | $16.90 | $46.83 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 | $31.75 | $14.90 | $46.65 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PR | $31.75 | $14.90 | $46.65 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 O | $29.93 | $16.90 | $46.83 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 | $26.21 | $16.62 | $42.83 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 1 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOY | $28.72 | $18.45 | $47.17 Top 10% +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151); MONROE AND WASHTENAW COUNTIES) SCOPE OF WORK: OPEN CUT | $32.10 | $17.45 | $49.55 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY; JACKSON, LAPEER AND | $30.29 | $17.45 | $47.74 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVAT | $29.98 | $22.75 | $52.73 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 2 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOY | $30.72 | $18.45 | $49.17 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL | $32.29 | $17.45 | $49.74 +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL | $34.10 | $17.45 | $51.55 Above median +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL | $31.98 | $22.75 | $54.73 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 2 MORTAR AND MATERIAL MIXER, CONCRETE FORM PERSON, SIGNAL PERSON, WELL POINT PERSON, MANHOLE, HEADWALL AND CATCH BASIN BUIL | $30.09 | $19.45 | $49.54 Bottom 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 3 (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOY | $26.72 | $18.45 | $45.17 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R | $26.09 | $19.45 | $45.54 Bottom 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R | $28.29 | $17.45 | $45.74 +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R | $30.10 | $17.45 | $47.55 Above median +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - OPEN CUT: GROUP 3 AIR, GASOLINE AND ELECTRIC TOOL OPERATOR, VIBRATOR OPERATOR, DRILLER, PUMP PERSON, TAR KETTLE OPERATOR, BRACER, RODDER, R | $28.14 | $22.75 | $50.89 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1 | $32.13 | $17.95 | $50.08 Bottom 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1 | $30.13 | $22.75 | $52.88 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2 | $34.40 | $17.95 | $52.35 Bottom 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 2 | $32.13 | $22.75 | $54.88 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3 | $28.00 | $17.45 | $45.45 Bottom 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3 | $28.13 | $22.75 | $50.88 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN/DRIVER | $33.32 | $18.40 | $51.72 Top 10% +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: JOURNEYMAN SIGNAL TECH, COMMUNICATIONS TECH, TOWER TECH & FIBER OPTIC SPLICERS | $49.26 | $23.66 | $72.92 Top 10% +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: JOURNEYMAN SPECIALIST JOURNEYMAN SPECIALIST: REFERS TO A CREW OF ONLY ONE PERSON WORKING ALONE | $56.65 | $26.09 | $82.74 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: OPERATOR A OPERATOR A: SHALL BE PROFICIENT IN OPERATING ALL POWER EQUIPMENT INCLUDING: BACKHOE, EXCAVATOR, DIRECTIONAL BORE AND BOO | $41.71 | $21.16 | $62.87 Top 10% +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: OPERATOR B OPERATOR B: SHALL BE PROFICIENT IN OPERATING ANY 2 OF THE ABOVE MENTIONED PIECES OF EQUIPMENT LISTED UNDER OPERATOR A | $38.98 | $20.26 | $59.24 Top 10% +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE PROTECTOR | $26.63 | $14.45 | $41.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE PROTECTOR (ZONE 2: STATEWIDE | $25.03 | $14.45 | $39.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.97 | $28.25 | $80.22 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.15 | $28.25 | $81.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.42 | $28.25 | $81.67 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $54.92 | $28.25 | $83.17 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $56.42 | $28.25 | $84.67 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 1 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHO | $37.37 | $15.44 | $52.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, SEWER RELINING: GROUP 2 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHO | $35.33 | $15.44 | $50.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRESSOR, WELDER AND FORKLIFT | $43.30 | $25.00 | $68.30 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER | $49.77 | $25.00 | $74.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER | $50.07 | $24.60 | $74.67 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER | $50.66 | $25.00 | $75.66 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1 | $55.02 | $28.25 | $83.27 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 10- TOWER CRANE & DERRICK OPERATOR ON A CRANE THAT REQUIRES AN OILER FOOTNOTE: PAID HOLIDAYS: NEW YEA | $52.70 | $28.25 | $80.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 13- CRANE OPERATOR; JOB MECHANIC AND 3 DRUM HOIST AND EXCAVATOR FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S D | $50.61 | $28.25 | $78.86 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 14- CRANE OPERATOR ON A CRANE THAT REQUIRES AN OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIA | $51.61 | $28.25 | $79.86 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 15- HOISTING OPERATOR; 2 DRUM HOIST AND RUBBER TIRED BACKHOE FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY | $49.97 | $28.25 | $78.22 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 16- FORKLIFT AND 1 DRUM HOIST FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY | $46.77 | $28.25 | $75.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 17- COMPRESSOR OR WELDER OPERATOR FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JU | $32.29 | $15.40 | $47.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 18- OILER FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIV | $35.78 | $28.25 | $64.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2 | $52.15 | $28.25 | $80.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3 | $50.61 | $28.25 | $78.86 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4 | $46.77 | $28.25 | $75.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5 | $32.29 | $15.40 | $47.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6 | $35.78 | $28.25 | $64.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9- TOWER CRANE & DERRICK OPERATOR FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JU | $51.70 | $28.25 | $79.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANIC WITH TRUCK AND TOOLS | $48.90 | $25.00 | $73.90 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER AND FIREMAN | $41.76 | $25.00 | $66.76 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR OPERATOR | $47.12 | $25.00 | $72.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 1 | $45.98 | $25.25 | $71.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 2 | $41.25 | $25.25 | $66.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 3 | $40.52 | $25.25 | $65.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 4 | $39.95 | $25.25 | $65.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION: GROUP 5 | $30.35 | $12.10 | $42.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER (ALLEGAN COUNTY; IONIA COUNTY; KENT, MECOSTA AND MONTCALM COUNTIES; NEWAYGO COUNTY; OSCEOLA COUNTY; OTTAWA COUNTY (TOWNSHIPS OF ALLENDALE, BLE | $25.49 | $13.74 | $39.23 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER (CLINTON COUNTY; EATON COUNTY; INGHAM COUNTY; IONIA COUNTY; LIVINGSTON COUNTY; AND SHIAWASSEE COUNTY) | $25.49 | $13.74 | $39.23 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER (MUSKEGON COUNTY; NEWAYGO COUNTY; OCEANA COUNTY; OTTAWA COUNTY:) | $25.49 | $13.74 | $39.23 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER FOOTNOTES: HIGH PAY: 30 TO 80 FT.: $.65 PER HOUR ADDITIONAL. 80 FT. AND OVER: $1.30 PER HOUR ADDITIONAL | $24.66 | $14.99 | $39.65 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: ALL OTHER WORK, INCLUDING MAINTENANCE OF INDUSTRIAL PLANT (ALCONA, ALPENA, ANTRIM, ARENAC, BAY, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFOR | $29.35 | $19.05 | $48.40 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER (EXCLUDES: ALLEGAN COUNTY; INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH, VAN BUREN) | $23.74 | $13.35 | $37.09 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY, SANDBLAST, SIGN PAINTING (EXCLUDES: ALLEGAN COUNTY; INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH | $24.94 | $13.35 | $38.29 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: WORK PERFORMED ON WATER, BRIDGES OVER WATER OR MOVING TRAFFIC, RADIO AND POWERLINE TOWERS, ELEVATED TANKS, STEEPLES, SMOKE STACKS OVER 40 FT | $29.23 | $19.11 | $48.34 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAVEMENT MARKING MACHINE: GROUP 1 Drives or operates a truck mounted striper, grinder, blaster, groover, or thermoplastic melter for the placement or | $33.37 | $14.45 | $47.82 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAVEMENT MARKING MACHINE: GROUP 1 Drives or operates a truck mounted striper, grinder, blaster, groover, or thermoplastic melter for the placement or | $35.51 | $14.45 | $49.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAVEMENT MARKING MACHINE: GROUP 2 ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE | $31.96 | $14.45 | $46.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAVEMENT MARKING MACHINE: GROUP 2 ZONE 2: STATEWIDE | $30.03 | $14.45 | $44.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE:: ALL OTHER WORK: (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN | $24.19 | $12.28 | $36.47 Top 10% -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE:: WELDING IN CONJUNCTION WITH GAS DISTRIBUTION PIPELINE WORK (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, A | $33.03 | $20.19 | $53.22 Top 10% +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1 BACKHOE, CRANE, GRADER, MECHANIC, DOZER, SIDE BOOM, TRENCHER, ENDLOAD | $39.78 | $25.25 | $65.03 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2 DOZER, ENDLOADER, SIDE BOOM, BACKFILLER, PUMPS, BOOM TRUCK, TRACTOR | $36.05 | $25.25 | $61.30 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 1 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL | $46.21 | $25.25 | $71.46 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 2 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL | $45.06 | $25.25 | $70.31 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 3 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL | $38.33 | $25.25 | $63.58 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 4 (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW, WAYNE, ALCONA, ALGER, AL | $37.77 | $25.25 | $63.02 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SIGN INSTALLER GROUP 1 | $22.03 | $11.83 | $33.86 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SIGN INSTALLER GROUP 1 | $21.78 | $11.83 | $33.61 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS | $33.65 | $0.75 | $34.40 Top 10% +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS | $33.55 | $0.75 | $34.30 Bottom 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS | $33.50 | $0.75 | $34.25 Top 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS | $33.40 | $0.75 | $34.15 Bottom 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER | $33.50 | $0.75 | $34.25 Top 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER | $33.40 | $0.75 | $34.15 Bottom 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1 | $24.12 | $19.04 | $43.16 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1 | $23.82 | $19.04 | $42.86 Bottom 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2 | $24.26 | $19.04 | $43.30 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 2 | $23.91 | $19.04 | $42.95 Bottom 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3 | $24.45 | $19.04 | $43.49 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 3 | $24.12 | $19.04 | $43.16 Bottom 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. LABORERS - OPEN CUT: GROUP 1 CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL B | $29.98 | $22.75 | $52.73 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORK, PICK PULLERS AND THOSE HANDLING NEEDLES, BLOWING OFF BY AIR PRESSURE, AND ANY PERSON RIGGING: $1.00 PER HOUR ADDITIONAL. STEEPLEJACK, TANKS, GAS | $23.79 | $12.02 | $35.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Oscoda, MI — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Oscoda
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Oscoda, Michigan.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.