Building Construction — Muskegon, Michigan

WD MI20260093-17146-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Muskegon, Michigan (construction type: building) is $40.00/hr base + $23.65/hr fringe = $63.65/hr total package (WD MI20260093-17146-bld, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: MI20260093-17146-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Muskegon
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference MI20260093View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $36.74 $80.24 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID H $35.83 $22.18 $58.01 +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.50 $21.15 $52.65 +78% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $17.26 $2.69 $19.95 -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.15 $12.78 $33.93 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS $22.69 $9.10 $31.79 Bottom 10% -9% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $21.32 $8.01 $29.33 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $18.92 $4.71 $23.63 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41 -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; SANDBLASTER $28.56 $12.95 $41.51 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.93 $1.62 $10.55 Above median -55% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.82 $3.59 $18.41 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.32 $3.28 $21.60 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $14.96 $4.01 $18.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.56 $4.95 $22.51 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.13 $7.02 $26.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.38 $3.44 $19.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS $41.28 $25.25 $66.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $39.57 $25.25 $64.82 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS D $33.71 $25.25 $58.96 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $31.23 $25.25 $56.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $15.72 $1.92 $17.64 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $28.75 $18.68 $47.43 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $17.28 $3.43 $20.71 -13% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $47.40 $23.35 $70.75 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $47.40 $23.35 $70.75 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.65 $14.80 $47.45 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.05 $6.51 $25.56 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $35.41 $15.86 $51.27 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $16.70 $4.02 $20.72 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAI $27.94 $21.15 $49.09 +91% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID $32.20 $23.46 $55.66 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75 Above median -44% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Muskegon, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Muskegon

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260093-17146-bld →