Heavy Construction — Missaukee, Michigan

WD MI20260043-15454-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Missaukee, Michigan (construction type: heavy) is $30.83/hr base + $21.09/hr fringe = $51.92/hr total package (WD MI20260043-15454-hvy, Rev. 1).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: MI20260043-15454-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Missaukee
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference MI20260043View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $30.83 $21.09 $51.92 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.10 $12.38 $35.48 Above median +25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.62 $23.05 $59.67 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $34.04 $70.59 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $22.42 $12.95 $35.37 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $26.70 $12.95 $39.65 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.02 $13.45 $38.47 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.89 $1.74 $12.63 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.97 $3.51 $19.48 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.28 $3.99 $19.27 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 1 $48.98 $25.25 $74.23 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2 $45.68 $25.25 $70.93 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3 $44.00 $25.25 $69.25 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4 $41.32 $25.25 $66.57 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 5 $32.98 $25.25 $58.23 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 1 $48.98 $25.25 $74.23 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 2 $45.68 $25.25 $70.93 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 3 $44.00 $25.25 $69.25 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 4 $41.32 $25.25 $66.57 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 5 $32.98 $25.25 $58.23 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $16.05 $9.55 $25.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.17 $9.51 $25.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $3.62 $19.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.68 $8.41 $22.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.74 $7.93 $21.67 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $43.50 $22.10 $65.60 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.89 $23.82 $63.71 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER $45.98 $25.25 $71.23 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.63 $1.25 $13.88 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Missaukee, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Missaukee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260043-15454-hvy →