The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Midland, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260138-15478-bld, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: MI20260138-15478-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Midland
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference MI20260138View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $16.19 $4.53 $20.72 Bottom 10% -6% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $21.43 $5.72 $27.15 -10% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.86 $23.69 $59.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $20.00 $1.22 $21.22 -28% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.98 $0.00 $18.98 -36% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $20.38 $4.88 $25.26 -14% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING $39.50 $25.03 $64.53 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING $40.00 $26.52 $66.52 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $19.27 $7.57 $26.84 +13% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $16.95 $4.74 $21.69 -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $19.75 $11.54 $31.29 +2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $30.02 $27.43 $57.45 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER $27.68 $13.45 $41.13 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $14.25 $3.89 $18.14 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SANDBLASTER $28.21 $13.45 $41.66 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.34 $1.22 $23.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR $47.28 $25.25 $72.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WIT $43.93 $25.25 $69.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP $39.57 $25.25 $64.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERA $33.71 $25.25 $58.96 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR W $31.23 $25.25 $56.48 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.02 $7.07 $35.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $29.23 $19.11 $48.34 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $30.22 $22.22 $52.44 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.50 $21.75 $67.25 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $26.32 $12.88 $39.20 +32% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.50 $22.10 $65.60 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.73 $7.41 $23.14 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.83 $23.78 $50.61 +71% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $17.57 $11.51 $29.08 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.43 $21.13 $52.56 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $14.40 $2.31 $16.71 Above median -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Midland, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Midland

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260138-15478-bld →