Building Construction — Lenawee, Michigan

WD MI20260131-15438-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Lenawee, Michigan (construction type: building) is $36.00/hr base + $20.15/hr fringe = $56.15/hr total package (WD MI20260131-15438-bld, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: MI20260131-15438-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Lenawee
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference MI20260131View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $36.00 $20.15 $56.15 +156% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID H $35.83 $22.18 $58.01 +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.41 $21.06 $56.47 +91% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.18 $18.11 $45.29 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.40 $17.79 $66.19 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $19.59 $7.57 $27.16 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $16.95 $4.74 $21.69 -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING & STRUCTURAL $35.50 $29.20 $64.70 +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER $32.35 $13.45 $45.80 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $29.04 $9.76 $38.80 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.34 $1.22 $23.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.02 $7.07 $35.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.86 $17.66 $44.52 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION $51.30 $25.87 $77.17 +108% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY $42.26 $23.70 $65.96 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $27.41 $16.10 $43.51 +47% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION $49.43 $24.36 $73.79 +99% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION.$ 46.29 25.43 PIPEFITTER: HVAC PIPE INSTALLATION ONLY $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $51.29 $25.35 $76.64 +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $49.79 $25.35 $75.14 +150% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $48.29 $25.35 $73.64 +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $47.99 $25.35 $73.34 +144% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMIN $47.17 $25.35 $72.52 +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH $46.31 $25.35 $71.66 +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 7 BOBCAT/SKID LOADER; LOADER;PAVER; SCRAPER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY $45.34 $25.35 $70.69 +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMB $43.63 $25.35 $68.98 +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND $35.29 $25.35 $60.64 +102% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.73 $7.41 $23.14 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.80 $21.51 $52.31 +76% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID $35.83 $22.18 $58.01 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.50 $0.00 $15.50 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77 Above median -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lenawee, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lenawee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260131-15438-bld →