Residential Construction — Lapeer, Michigan

WD MI20260028-15463-res · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Lapeer, Michigan (construction type: residential) is $40.74/hr base + $32.59/hr fringe = $73.33/hr total package (WD MI20260028-15463-res, Rev. 2).

Scroll down for all 55 trade classifications covered by this determination.

WD Number: MI20260028-15463-res
Revision: 2
Construction Type: residential
State: Michigan (MI)
County: Lapeer
Effective: May 17, 2026
Trades covered: 55
Official source: SAM.gov reference MI20260028View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.74 $32.59 $73.33 Above median +234% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FLOOR LAYING-CARPET $36.46 $22.69 $59.15 +100% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FLOOR LAYING-CARPET (LIVINGSTON COUNTY) $36.21 $21.06 $57.27 +94% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FLOOR LAYING-CARPET: MULTI-FAMILY CONDOMINIUMS (LIVINGSTON, MACOMB & WAYNE COUNTIES) $31.58 $16.27 $47.85 +62% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FLOOR LAYING-CARPET: SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS (LIVINGSTON, MACOMB & WAYNE COUNTIES) $29.19 $15.76 $44.95 +52% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.27 $5.85 $25.12 -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $35.62 $13.70 $49.32 Top 10% +41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LIVINGSTON COUNTY) $36.65 $20.38 $57.03 +63% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LIVINGSTON COUNTY) $31.20 $10.97 $42.17 +21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING (LIVINGSTON, MACOMB & WAYNE COUNTIES) $29.42 $16.50 $45.92 +31% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION PAY: 8% WITH 5 OR MORE YEARS OF SERVICE, 6% FOR 6 MONTHS TO 5 YEARS SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, ME $65.45 $38.44 $103.89 +89% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: VACATION PAY: 8% WITH 5 OR MORE YEARS OF SERVICE, 6% FOR 6 MONTHS TO 5 YEARS SERVICE. PAID HOLIDAYS: NEW YEARS DAY, MEMORI $65.01 $38.44 $103.45 +88% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $23.00 $8.17 $31.17 +12% vs market $0.00 $0.00 $0.00 $0.00
HOUR ADDITIONAL $45.34 $25.35 $70.69 $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.55 $35.93 $72.48 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE $38.11 $15.45 $53.56 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE $29.46 $16.10 $45.56 +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LIVINGSTON COUNTY) $38.00 $18.25 $56.25 +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.99 $5.46 $23.45 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE $38.00 $18.25 $56.25 +140% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81 $0.00 $0.00 $0.00 $0.00
MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $45.68 $25.25 $70.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND J $48.98 $25.25 $74.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $51.29 $25.35 $76.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $49.79 $25.35 $75.14 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; AND SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $48.29 $25.35 $73.64 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/ SKID LOADER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMI $47.99 $25.35 $73.34 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGT $46.31 $25.35 $71.66 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER (LAPEER COUNTY) $22.25 $11.10 $33.35 +41% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER (LAPEER COUNTY) $23.79 $12.02 $35.81 +51% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER (LIVINGSTON COUNTY) $21.84 $18.63 $40.47 +71% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER (LIVINGSTON, MACOMB & WAYNE COUNTIES) $20.14 $14.72 $34.86 +47% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY $26.46 $20.60 $47.06 Bottom 10% +27% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LIVINGSTON COUNTY) $44.31 $0.00 $44.31 +20% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LIVINGSTON COUNTY:) $31.35 $22.90 $54.25 +47% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (LIVINGSTON, MACOMB & WAYNE COUNTIES) $41.61 $29.35 $70.96 +92% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION $26.46 $20.60 $47.06 +27% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LIVINGSTON COUNTY) $42.26 $23.70 $65.96 +78% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LIVINGSTON COUNTY:) $31.35 $22.90 $54.25 +47% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (LIVINGSTON, MACOMB & WAYNE COUNTIES) $27.06 $23.52 $50.58 +37% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $42.67 $21.62 $64.29 Above median +138% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.38 $19.87 $50.25 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $42.68 $28.75 $71.43 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $24.88 $8.76 $33.64 +13% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $32.00 $10.73 $42.73 +44% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $28.67 $9.50 $38.17 +29% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $22.32 $4.51 $26.83 -28% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $40.53 $23.62 $64.15 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $26.93 $18.69 $45.62 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRA $47.17 $25.35 $72.52 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE $31.03 $0.70 $31.73 +20% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lapeer, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lapeer

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260028-15463-res →