Heavy Construction — Lake, Michigan

WD MI20260049-15475-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Lake, Michigan (construction type: heavy) is $23.97/hr base + $6.29/hr fringe = $30.26/hr total package (WD MI20260049-15475-hvy, Rev. 1).

Scroll down for all 44 trade classifications covered by this determination.

WD Number: MI20260049-15475-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Lake
Effective: May 17, 2026
Trades covered: 44
Official source: SAM.gov reference MI20260049View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $23.97 $6.29 $30.26 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FORM WORK ONLY $28.29 $21.42 $49.71 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FORM WORK ONLY $42.44 $31.43 $73.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.02 $12.38 $34.40 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.23 $22.11 $54.34 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.32 $28.54 $79.86 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.78 $21.84 $64.62 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LAKE & MASON COUNTIES) $36.52 $25.15 $61.67 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (LAKE & MASON COUNTIES) $36.62 $23.05 $59.67 Bottom 10% +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $34.04 $70.59 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $22.42 $12.95 $35.37 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $27.21 $13.45 $40.66 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $28.56 $12.95 $41.51 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $30.35 $17.90 $48.25 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $22.73 $12.95 $35.68 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.89 $1.74 $12.63 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.97 $3.51 $19.48 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.28 $3.99 $19.27 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 1 $48.98 $25.25 $74.23 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 2 $45.68 $25.25 $70.93 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 3 $44.00 $25.25 $69.25 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 4 $41.32 $25.25 $66.57 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEER: GROUP 5 $32.98 $25.25 $58.23 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 1 $48.98 $25.25 $74.23 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 2 $45.68 $25.25 $70.93 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 3 $44.00 $25.25 $69.25 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 4 $41.32 $25.25 $66.57 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 5 $32.98 $25.25 $58.23 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $3.62 $19.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.74 $7.93 $21.67 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $40.41 $29.35 $69.76 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.77 $35.13 $70.90 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $39.89 $23.82 $63.71 +72% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $35.20 $22.35 $57.55 +55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER $45.98 $25.25 $71.23 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.06 $1.25 $15.31 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lake, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lake

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260049-15475-hvy →