Heavy Construction — Ionia, Michigan

WD MI20260059-15495-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Ionia, Michigan (construction type: heavy) is $36.21/hr base + $21.06/hr fringe = $57.27/hr total package (WD MI20260059-15495-hvy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: MI20260059-15495-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Ionia
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference MI20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $36.21 $21.06 $57.27 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.15 $12.78 $33.93 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.52 $25.15 $61.67 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.00 $31.37 $76.37 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $34.04 $70.59 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER-CEMENT/CONCRETE) $22.55 $12.95 $35.50 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.23 $3.58 $16.81 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE $28.56 $12.95 $41.51 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE $32.53 $13.45 $45.98 +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.21 $1.96 $14.17 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.00 $4.66 $20.66 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $22.61 $8.40 $31.01 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.17 $5.84 $27.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $18.50 $5.10 $23.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.64 $0.00 $16.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.41 $4.97 $22.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY $44.00 $25.25 $69.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEM $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $41.32 $25.25 $66.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DA $35.46 $25.25 $60.71 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $21.89 $11.85 $33.74 Top 10% +42% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $19.90 $5.63 $25.53 -31% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.89 $23.82 $63.71 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $42.29 $23.94 $66.23 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER $45.98 $25.25 $71.23 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION: GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20 +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $16.50 $4.89 $21.39 Above median -19% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Ionia, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.