Building Construction — Huron, Michigan

WD MI20260125-15473-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Huron, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260125-15473-bld, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: MI20260125-15473-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Huron
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference MI20260125View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.14 $24.20 $59.34 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $35.86 $23.69 $59.55 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $19.59 $7.57 $27.16 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.32 $28.44 $79.76 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LOW VOLTAGE WIRING ONLY $37.62 $14.80 $52.42 +50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LOW VOLTAGE WIRING ONLY $30.12 $14.57 $44.69 +28% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $16.95 $4.74 $21.69 -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $36.55 $33.37 $69.92 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.55 $35.93 $72.48 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $30.02 $27.43 $57.45 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER $26.20 $13.45 $39.65 +69% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SANDBLASTER $26.73 $13.45 $40.18 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.92 $39.13 $82.05 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.34 $1.22 $23.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR $47.28 $25.25 $72.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK CRANE OPERATOR WIT $43.93 $25.25 $69.18 $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP $39.57 $25.25 $64.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERA $33.71 $25.25 $58.96 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR W $31.23 $25.25 $56.48 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.02 $7.07 $35.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $23.79 $12.02 $35.81 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $23.79 $12.02 $35.81 +51% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION $45.50 $21.75 $67.25 +82% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: HVAC PIPE INSTALLATION ONLY $45.50 $21.75 $67.25 Above median +82% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION $41.96 $40.85 $82.81 +124% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $33.09 $26.58 $59.67 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION $36.69 $32.74 $69.43 +87% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION $43.50 $22.10 $65.60 +77% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.73 $7.41 $23.14 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.83 $23.78 $50.61 +71% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.43 $21.13 $52.56 Above median +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77 Above median -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Huron, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Huron

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260125-15473-bld →