Building Construction — Hillsdale, Michigan

WD MI20260123-15493-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Hillsdale, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260123-15493-bld, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: MI20260123-15493-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Hillsdale
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference MI20260123View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $19.82 $7.31 $27.13 Bottom 10% +23% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID H $35.28 $26.30 $61.58 +103% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.29 $21.42 $49.71 +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $19.59 $7.57 $27.16 -8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.18 $18.11 $45.29 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.40 $17.79 $66.19 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $16.95 $4.74 $21.69 -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $30.02 $27.43 $57.45 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER $32.35 $13.45 $45.80 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.04 $26.47 $66.51 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.34 $1.22 $23.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $28.02 $7.07 $35.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $32.86 $20.41 $53.27 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $21.75 $11.94 $33.69 +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $32.85 $20.41 $53.26 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $21.75 $11.94 $33.69 +42% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.86 $17.66 $44.52 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.75 $11.94 $34.69 +46% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.29 $25.43 $71.72 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HO $33.09 $26.58 $59.67 +101% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER.$ 46.29 25.43 PIPEFITTER $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR L $47.28 $25.25 $72.53 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR W $43.93 $25.25 $69.18 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP $39.57 $25.25 $64.82 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERAT $33.71 $25.25 $58.96 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WI $31.23 $25.25 $56.48 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.73 $7.41 $23.14 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $42.74 $21.53 $64.27 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID $32.20 $23.46 $55.66 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77 Above median -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hillsdale, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hillsdale

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260123-15493-bld →