Residential Construction — Dickinson, Michigan

WD MI20260007-15504-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Dickinson, Michigan (construction type: residential) is $27.94/hr base + $21.34/hr fringe = $49.28/hr total package (WD MI20260007-15504-res, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: MI20260007-15504-res
Revision: 1
Construction Type: residential
State: Michigan (MI)
County: Dickinson
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference MI20260007View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $27.94 $21.34 $49.28 +63% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL FINISHING/TAPING $34.01 $23.14 $57.15 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.55 $6.35 $25.90 -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.44 $18.67 $52.11 +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MENOMINEE & SCHOOLCRAFT COUNTIES) $31.86 $18.66 $50.52 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (MENOMINEE COUNTY) $19.62 $10.72 $30.34 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS $180,000 OR LESS $30.18 $18.42 $48.60 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS OF $180,000 OR LESS $30.18 $18.42 $48.60 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000 $32.38 $18.63 $51.01 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE $24.05 $6.45 $30.50 Bottom 10% +30% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER $40.51 $25.00 $65.51 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $15.09 $3.53 $18.62 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $14.36 $1.98 $16.34 -31% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $36.51 $26.68 $63.19 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.50 $15.95 $42.45 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $18.88 $6.10 $24.98 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.00 $1.25 $13.25 -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dickinson, MI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dickinson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260007-15504-res →