Building Construction — Branch, Michigan

WD MI20260110-15489-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY in Branch, Michigan (construction type: building) is $41.28/hr base + $25.25/hr fringe = $66.53/hr total package (WD MI20260110-15489-bld, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: MI20260110-15489-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Branch
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference MI20260110View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.28 $25.25 $66.53 Bottom 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $19.82 $7.31 $27.13 Bottom 10% +23% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID H $35.83 $22.18 $58.01 +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.29 $21.42 $49.71 +68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.63 $12.88 $37.51 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $25.74 $66.74 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $19.59 $7.57 $27.16 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $16.95 $4.74 $21.69 -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $30.02 $27.43 $57.45 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER : COMMON OR GENERAL; SANDBLASTER $27.21 $13.45 $40.66 +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE $30.72 $12.95 $43.67 +87% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.04 $26.47 $66.51 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.34 $1.22 $23.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $26.64 $8.09 $34.73 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $27.07 $16.46 $43.53 +83% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $27.32 $16.72 $44.04 +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $27.07 $16.56 $43.63 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.29 $25.43 $71.72 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $21.18 $12.43 $33.61 Bottom 10% +13% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER.$ 46.29 25.43 PIPEFITTER $46.29 $25.43 $71.72 +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR L $47.28 $25.25 $72.53 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR W $43.93 $25.25 $69.18 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP $39.57 $25.25 $64.82 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERAT $33.71 $25.25 $58.96 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WI $31.23 $25.25 $56.48 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.73 $7.41 $23.14 -14% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $42.74 $21.53 $64.27 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID $35.83 $22.18 $58.01 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77 Above median -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Branch, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Branch

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260110-15489-bld →